12
In the control cabinet: Installing the SPECTOR
control
Attention
■
Avoid locations where direct sunlight falls onto the screen.
■
The mounting angle must not exceed ± 35° from the vertical.
■
Make sure the seal is seated correctly on the front panel. On units with a round seal,
the two ends of the seal must meet at the bottom of the unit without a gap.
■
Avoid tightening torques greater than 0.5 Nm as this could damage the equipment.
■
The front panel may have a maximum thickness of 5 mm
In the control cabinet: Connecting the SPECTOR
control
Spector
control
wiring diagram
1
Functional earth terminal
2
Power supply
3
COM1
4
CAN
5
4x USB
Key
6
Network adapter 1: maintenance/service
7
Network adapter 2: Et Ethernet fieldbus
8
SD card slot
9
Battery
0
PC/104 slot (optional Profibus)
Fig. 5
24 V DC
reserved
2
0 V DC
Fig. 4
5
7
1
4
6
3
2
0
8
9
continued
Summary of Contents for SPECTORcontrol II
Page 18: ...18 Bringing into service Home screens ...
Page 30: ...30 For your notes ...
Page 31: ...31 For your notes ...