11
In the control cabinet: Installing the SPECTOR
control
Spector
control
dimensions
Installation in control cabinet
The SPECTOR
control
is installed in the door of the control cabinet. It is fastened from the rear using the
integrated threaded pins. The SPECTOR
control
can be operated up to a max. ambient temperature of
50 °C. Please note that direct sunlight (UV light) reduces the service life of the liquid crystals. Install the
SPECTOR
control
as follows:
■
Unscrew the lock nuts and take off the mounting frame.
■
Insert the supplied seal in the groove in the front frame.
■
Push the SPECTOR
control
from the front into the front panel cutout.
■
Push the mounting frame back onto the threaded pins. Screw the unit onto the mounting frame using
the four lock nuts, making sure they are tightened evenly. Stop tightening when the front frame is flush
with the front panel all the way round.
Fig. 3
Front panel cutout
287,0
321,0
329,0
196,
0
229,
8
238,
0
5,5
135.0°
The maximum thickness of the
front panel is 5 mm
continued
continued
Summary of Contents for SPECTORcontrol II
Page 18: ...18 Bringing into service Home screens ...
Page 30: ...30 For your notes ...
Page 31: ...31 For your notes ...