When using the operating device URB ... all parameters can be set via its user interface.
NRR 240
Commissioning Procedure
Apply mains voltage.
The four status LEDs are flashing rapidly.
The LED “Power” is illuminated.
The system test takes 2 seconds.
A
Desired measuring range [mm]
B
Max. measuring range
C
Lower measuring point
Establish the appropriate measuring
range
A
for your level monitoring
sytem.
Press button for 3 sec.
Lower liquid level until the lower limit
of the control range
A
is reached.
If necessary first use button to
adjust the upper limit of the control
range.
Setting measuring range
NRG 2640
Measuring range
Fig. 17
37
26
A
B
1
2
3
4
Test
P
1
2
3
E
4
MAX
MIN
W
X
W
+
-
GESTRA
NRR 2-40
C
Using operating device URB... for parameter setting
Summary of Contents for NRR 2-40
Page 1: ...1 E N English Level Controller NRR 2 40 Original Installation Instructions 810369 06 ...
Page 9: ...9 Technical Data continued Dimensions Fig 2 1 1 8 100 73 ...
Page 10: ...10 Design 0 Fig 3 9 NRR 2 40 9 a ...
Page 11: ...11 Functional Elements NRR 2 40 Fig 5 Fig 4 1 7 6 5 4 3 2 8 ...
Page 13: ...13 Installation continued Fig 6 Example of Installation b 9 0 0 Fig 7 20 20 a ...