© 2019 Genesis Attachments, LLC
Genesis GVP 07 29
SHEAR JAW SET MAINTENANCE
Check
gap
Wear plate
Piercing
tip
Daily Maintenance Checks
Perform the following daily maintenance checks to keep
the equipment in good operating condition.
• Ensure proper pivot group adjustment.
• Check blades, guide block and piercing tip for
excess wear. Rotate or replace as needed.
• Inspect jaw for wear, including the chin where the
piercing tip meets the lower jaw. Perform build-up
and hard-surfacing as needed.
Piercing Tip
Proper maintenance of the piercing tip boosts productiv-
ity and prevents material jams. Inspect the piercing tip
daily for wear and perform maintenance every 20-40
hours, depending on the application.
Slowly cycle the shear until the piercing tip is flush with
the top edge of the chin.
Check the gap with a tape measure. Acceptable gap is
1/4” – 3/8” (6 - 9.5 mm)
Check the condition of the piercing tip with a straight
edge or square. Check the profile along the blades.
If the piercing tip is only slightly worn, it can be built up
following the build-up and hard-surfacing procedure in
this manual. When the tip is severely worn, it must be
replaced.
Piercing Tip Replacement
Important:
Remove the upper secondary blade and up-
per wear plate during this procedure to prevent damage.
Preheat the tip area to 350° F (177° C), six to eight inch-
es around the tip. Maintain this temperature throughout
the procedure. Do not exceed 400° F interpass tempera-
ture.
Air arc to remove the piercing tip. Clean the pocket and
chamfer the perimeter at ½” x 45° angles.
Position and tack the new piercing tip in place, square
with the blades and new wear plate.