![Generac Power Systems HTS Wn Owner'S Manual Download Page 10](http://html1.mh-extra.com/html/generac-power-systems/hts-wn/hts-wn_owners-manual_2209792010.webp)
8
3.2.1 CLOSE TO NORMAL SOURCE SIDE
Before proceeding, verify the position of the switch by observing
window “A” in Figure 3.1. If window “A” reads “ON”, proceed with
Step 1, and if it reads “OFF”, proceed with Step 2.
Step 1: With the handle attached to the actuating shaft, move
•
handle in the direction of the arrow on the switch cover
until it stops — DO NOT FORCE. Release handle slowly
to allow the spring in the switch box to relax. “OFF” now
appears in Window “A” and “ON” appears in Window
“B”. (Proceed with Step 2).
Step 2: With the handle attached to the actuating shaft, move
•
handle in the direction of the arrow on the switch cover
until it stops — DO NOT FORCE. Release handle slowly
to allow the spring in the switch box to relax. “ON” now
appears in Window “A” and “OFF” appears in Window
“B”. (Proceed with B: Close to STANDBY Source Side).
3.2.2 CLOSE TO STANDBY SOURCE SIDE
Before proceeding, ensure that the previous 3.2.1, “Step 2” Close
to NORMAL Source Side is completed. See Figure 3.1. This will
ensure that Window “B” on the switch reads “OFF”. With the
handle attached to the actuating shaft, move the handle in the
direction of the arrow on the switch cover until it stops - DO NOT
FORCE. Release handle slowly to allow the spring in the switch
box to relax. “OFF” now appears in Window “A” and “ON” appears
in Window “B”.
3.2.3 RETURN TO NORMAL SOURCE SIDE
Manually actuate switch to return Window “A” to the “ON” posi-
tion.
3.3 VOLTAGE
CHECKS
DANGER
Disconnect all loads from the transfer switch
until all voltage checks and phase rotation
checks have been completed to prevent pos-
sible injury to personnel and, or damage to
equipment.
For safety, set the Maintenance Disconnect
switch (inside transfer switch enclosure) to its
MANUAL position before proceeding with volt-
age checks.
Before proceeding, check the transfer switch
data label for switch rated voltage. Make
sure the data label voltage is compatible with
NORMAL and STANDBY power source voltages.
Proceed with caution. Do not touch electrically
hot terminals, wires, etc. During the voltage
checks, the transfer switch is electrically ener-
gized.
Perform voltage checks as follows:
1. Inside the transfer switch enclosure, set the Maintenance
Disconnect switch to MANUAL.
2. If generator is so equipped, set the AUTO-OFF-MANUAL
switch to OFF.
3. Check that the word “ON” is visible in Window “A”, the word
“OFF” in Window “B”. See MANUAL OPERATION for location
of “A” and “B” windows.
IMPORTANT: DO NOT PROCEED UNTIL STEPS 1, 2, AND 3 HAVE
BEEN COMPLETED.
Before proceeding to voltage checks, manu-
ally connect the load to NORMAL power supply.
Window “A” must indicate ON, Window “B” must
indicate OFF before proceeding.
4. Locate the battery disconnect connector on the outside of the
transfer switch controller. Plug the two connectors together.
NOTE:
If BOTH UTILITY and GENERATOR sources are unavailable for
more than 24 hours, disconnect battery by unplugging battery
disconnect leads.
5. Turn ON the NORMAL (UTILITY) power supply to the transfer
switch, with whatever means provided (such as the main line
circuit breaker).
DANGER
The transfer switch is now electrically hot.
Proceed with caution.
6. With UTILITY voltage available to the transfer switch, check
that the SWITCH - POSITION UTILITY LED on the enclosure
door is ON. If the SWITCH - POSITION UTILITY LED is OFF,
turn off the utility power supply to the transfer switch by what-
ever means provided (such as the main line circuit breaker),
then proceed back to Step 1 of “VOLTAGE CHECKS”.
7. On the enclosure door, check that the UTILITY AVAILABLE
LED is ON.
8. With an accurate AC voltmeter, check the phase-to-phase (line-
to-line) and phase-to-neutral (line-to-neutral) voltages present
at transfer mechanism terminals N1, N2, N3 and neutral.
SUPPLIED VOLTAGES MUST BE FULLY COMPATIBLE WITH
TRANSFER SWITCH RATED VOLTAGE.
DANGER
Ensure that the phase rotation of NORMAL
(UTILITY) power lines and transfer switch load
power lines are compatible.
9. Refer to the standby generator instruction manual. Make sure
the generator engine has been properly serviced and prepared
for use, as outlined in that manual. Then start the generator
engine manually. Let the engine stabilize and warm up for a
few minutes.
Section 3 — Operation
HTS “Wn” Type Transfer Switch
Summary of Contents for HTS Wn
Page 16: ...14 Section 5 Notes HTS Wn Type Transfer Switch 14...
Page 17: ...15 Section 5 Notes HTS Wn Type Transfer Switch 15 15...
Page 18: ...16 Section 6 Mounting Dimensions 600 1000A NEMA 12 Drawing No 0F6963 D...
Page 19: ...17 Section 6 Mounting Dimensions 600 1000A NEMA 12 Drawing No 0F6963 D...
Page 20: ...18 Section 6 Mounting Dimensions 600 1000A NEMA 3R Drawing No 0F7314 D...
Page 21: ...19 Section 6 Mounting Dimensions 600 1000A NEMA 3R Drawing No 0F7314 D...
Page 22: ...20 Section 6 Mounting Dimensions 1200 1600A NEMA 12 Drawing No 0F7520 C...
Page 23: ...21 Section 6 Mounting Dimensions 1200 1600A NEMA 12 Drawing No 0F7520 C...
Page 24: ...22 Section 6 Mounting Dimensions 1200 1600A NEMA 3R Drawing No 0F7521 C...
Page 25: ...23 Section 6 Mounting Dimensions 1200 1600A NEMA 3R Drawing No 0F7521 C...
Page 26: ...24 Section 6 Mounting Dimensions 2000 2600A NEMA 12 Drawing No 0F8944 C...
Page 27: ...25 Section 6 Mounting Dimensions 2000 2600A NEMA 12 Drawing No 0F8944 C...
Page 28: ...26 Section 6 Mounting Dimensions 2000 2600A NEMA 3R Drawing No 0F8945 C...
Page 29: ...27 Section 6 Mounting Dimensions 2000 2600A NEMA 3R Drawing No 0F8945 C...
Page 30: ...28 Section 7 Wiring Diagrams Electrical Schematics Wiring Diagram 208 240V Drawing No 0F7043 B...
Page 31: ...29 Section 7 Wiring Diagrams Electrical Schematics Wiring Diagram 208 240V Drawing No 0F7043 B...
Page 34: ...32 Section 7 Wiring Diagrams Electrical Schematics Wiring Diagram 480 600V Drawing No 0F7045 B...
Page 35: ...33 Section 7 Wiring Diagrams Electrical Schematics Wiring Diagram 480 600V Drawing No 0F7045 B...