17973 G
MLT6SM/K-8SK Operating Manual
17
Section 3 - Operation
LIGHT TOWER SET UP
1. For maximum light coverage, locate the unit at ground level or in a spot higher than the area being illuminated
by the lamps.
WARNING
The mast extends up to 23 ft (7 m). Make sure the area above the unit is open and
clear of overhead wires and obstructions. Do not set up the unit if high winds or
storms capable of producing lightning are expected in the area.
Figure 7 - Set Up of Outriggers and Jacks
2. Place the unit on firm ground that is relatively flat, then block the wheels to keep it from moving (A). This will
make it easier to level the unit.
3. Pull the locking pin on the tongue jack and rotate the jack 90°. Replace the locking pin (B). Turn the jack
handle clockwise to raise the trailer tongue off of the towing vehicle.
4. A grounding stud is located on the rear frame of the trailer near the left side outrigger (B). For grounding
requirements, follow and local, state or National Electrical Code (NEC) guidelines.
5. Pull the locking pin (D) on the outrigger (E) and pull each outrigger out until the spring loaded locking pin
snaps back into place. Pull the locking pin on the outrigger jack and rotate each jack 180° so the jack pad is
facing down. Replace the locking pin.
00843
DETAIL B
DETAIL C
DETAIL E
A
B
C
D
E
E
1”
F
Summary of Contents for MLT6SK
Page 4: ...iv This Page Intentionally Left Blank ...
Page 12: ...Safety 6 MLT6SM K 8SK Operating Manual 17973 G This Page Intentionally Left Blank ...
Page 32: ...Operation 26 MLT6SM K 8SK Operating Manual 17973 G This Page Intentionally Left Blank ...
Page 34: ...Maintenance 32 MLT6SM K 8SK Operating Manual 17973 G This Page Intentionally Left Blank ...
Page 36: ......