– SETTING UP
AFTER INSTALLING THE APPLIANCE, WAIT AT LEAST TWO HOURS BEFORE TURNING IT ON.
6.1
– CONNECTIONS
6.1.1
– ELECTRICAL CONNECTION
Electrical connection must be made by a specialised electrician.
−
Check that the power supply voltage given on the ID plate corresponds to that available at the
installation site.
−
Connections must be made to current regulations; the supply mains must have an efficient
earthing system compliant with electricity regulations in the country; this is a responsibility of
the customer.
−
Do not make tight bends on the power lead and do not place any object whatsoever on top of
it.
If it is necessary to unplug the mains supply, first make sure the main switch is on OFF.
The manufacture declines all responsibility for damage or accidents caused by failure to
observe such regulations.
ELECTRICAL CONNECTION PROCEDURE
The appliance is supplied by the manufacturer complete with power plug. Just connect the power plug to a socket at the
installation site; the system must be carried out to current regulations.
The electricity supply at the installation site must have the following requisites:
−
Voltage: 115 Vac (BCB/05US); 230 Vac (BCB/10US)
−
Frequency: 60 Hz
6.2
– PRELIMINARY CHECKS
The electrician fitter shall train the operator in the correct use of the blast chiller and give the basic notions of maintenance.
METHOD
The operations to prepare the blast chiller for initial start-up must be carried out by a specialised engineer, in the presence
of the operator, who can acquire information to carry out certain routine maintenance and cleaning.
Before starting up the appliance, a series of checks and inspections must be carried out for the purpose of preventing
errors or accidents during start-up.
−
Check that the appliance has not been damaged during transport.
−
Check with special care for any damage to the electrical box, push button control panel, wiring and pipes.
−
Check that all external power sources have been connected properly.
−
Check that the machine is perfectly level.
6.2.1
– REGULATION
Regulation carried out by unauthorized personnel may damage the appliance and expose the
operator to serious hazards. Regulation carried out by unauthorized personnel is considered
tampering with the appliance and as such null the warranty and relieve the manufacturer of any
responsibility.
Summary of Contents for New Runner BCB/05US
Page 2: ...BCB US Rev 00 01 2019 pag 2 Serial Number...
Page 12: ...BCB US Rev 00 01 2019 pag 12 2 2 DECLARATION OF CONFORMITY...
Page 24: ...BCB US Rev 00 01 2019 pag 24 7 3 CONTROL PANEL or Fig 7...
Page 39: ...BCB US Rev 00 01 2019 pag 39...
Page 40: ...BCB US Rev 00 01 2019 pag 40...
Page 41: ...BCB US Rev 00 01 2019 pag 41...
Page 42: ...BCB US Rev 00 01 2019 pag 42 NOTE...
Page 43: ......