Gemini Profiling System
0695-SOM-00001, Issue: 03
28
© Tritech International Ltd.
8. Gemini Hub Installation
8.1. Overview
Warning
The Gemini Hub is intended for INDOOR USE ONLY and should not be
placed in a position where it could get wet.
The Gemini 620pd is designed to be used as part of a survey system and is supplied
with the Gemini Hub unit to enable multiple sensors to be connected through an
Ethernet link to an IT infrastructure.
All status indication is by front panel LEDs which illuminate depending on the
operating conditions.
8.2. Mounting the Hub
The Gemini Hub should be rack-mounted in a suitable frame designed for industrial
computer equipment and fixed in place using the four mounting holes on the front
panel. The handles are to aid insertion into a rack system and are not designed to be
used as a means for carrying the Hub.
Caution
The power lead should be plugged into a suitable location to allow for
access and disconnection at all times to provide a method of cutting power
to the unit and should be labelled to identify it as the disconnecting device.
Warning
This unit requires an earth connection and the power lead must be plugged
into an earthed power socket using a three pin plug.
The rack unit should be adequately ventilated to provide cooling to the system and
the vents should be clear of any obstruction. An internal fan is present within the hub
and care should be taken to ensure the air supply is appropriately dry and filtered.