![GEM iComLine CleanStar C57 HPW Installation, Operating And Maintenance Instruction Download Page 37](http://html1.mh-extra.com/html/gem/icomline-cleanstar-c57-hpw/icomline-cleanstar-c57-hpw_installation-operating-and-maintenance-instruction_2206336037.webp)
Prior to cleaning or commissioning the
plant:
G
Check the tightness and the function of
the diaphragm globe valve (close and
reopen the diaphragm globe valve).
G
If the plant is new and after repairs rinse
the piping system with a fully opened
diaphragm globe valve (to remove any
harmful foreign matter).
Cleaning:
The plant operator is responsible for
selecting the cleaning material and
performing the procedure.
13 Inspection and servicing
WARNING
The equipment is subject to pressure!
®
Risk of severe injury or death!
G
Only work on depressurized plant.
CAUTION
Hot plant components!
®
Risk of burns!
G
Only work on plant that has
cooled down.
CAUTION
G
Servicing and maintenance work may
only be performed by trained personnel.
G
GEMÜ shall assume no liability
whatsoever for damages caused
by improper handling or third-party
actions.
G
In case of doubt, contact GEMÜ before
commissioning.
1. Use appropriate protective gear as
speci
fi
ed in plant operator's guidelines.
2. Shut o
ff
plant or plant component.
3. Secure against recommissioning.
4. Depressurize the plant or plant
component.
The operator must carry out regular visual
examination of the diaphragm globe valves
dependent on the operating conditions and
the potential danger in order to prevent
leakage and damage.
When ordering the diaphragm globe
valve, please state the complete
order number.
14 Disassembly
Disassembly is performed observing
the same precautionary measures as for
installation.
G
Disassemble the diaphragm globe
valve (see chapter 10.1 "Installing the
diaphragm globe valve").
15 Disposal
G
Fully rinse the diaphragm
globe valve before disposal.
G
The diaphragm globe
valve must be disposed of
according to relevant local or
national disposal regulations
/ environmental protection
laws.
G
Pay attention to adhered
residual material and gas
di
ff
usion from penetrated
media.
16 Returns
G
Clean the diaphragm globe valve.
G
Request a goods return declaration form
from GEMÜ.
G
Returns must be made with a completed
declaration of return.
If not completed, GEMÜ cannot process
credits or
repair work
but will dispose of the goods at the
operator's expense.
37 / 44
C57 HPW
Summary of Contents for iComLine CleanStar C57 HPW
Page 42: ...42 44 C57 HPW...
Page 43: ...43 44 C57 HPW...