![Geberit ACO 102 Operation Manual Download Page 14](http://html1.mh-extra.com/html/geberit/aco-102/aco-102_operation-manual_4028128014.webp)
14
Commissioning
B
102
4-0
0
1
© 01
-20
1
2
Commissioning
Inserting the pressing jaw
Prerequisites
Pressing tool is switched off.
WARNING
Danger of crushing by exposed parts
`
Do not hold any parts of your body or other objects in between the pressing jaws
`
Keep your fingers away from the area of the roller if there is no pressing jaw inserted
CAUTION
Damage to the device caused by incompletely pushed-in retaining pin
`
Push the retaining pin in completely and lock it
1
Turn the retaining pin by 180° to the front and pull it out (see cover page in the front, figure A).
2
Insert the pressing jaw in the pressing tool (see cover page in the front, figure B).
3
Push the retaining pin in until the stop position is reached and turn it by 180° to the rear (see cover page in the
front, figure C).
Charging and inserting the rechargeable battery
CAUTION
Damage to the device if incorrect rechargeable battery is used
`
Make sure that the voltage of the rechargeable battery corresponds to the details on the specification plate of
the tool
Read the operating instructions for the battery charger for information on how the battery charger functions.
Remove the rechargeable battery from the pressing tool before transporting and storing it; otherwise the
rechargeable battery will run flat.
1
Charge the rechargeable battery before commissioning.
2
Insert the rechargeable battery in the pressing tool from the rear (see cover page in the back, figure D).
Result
Pressing tool is in standby mode. No LED lights up.
Operation
Pressing with pressing jaws
Prerequisites
- Pipe ends are deburred and clean
- Pipe and pressfitting have been fitted together in accordance with the installation instructions
The procedure for pressing depends on the type of pressing jaw and is therefore described in the operating
instructions of the pressing jaw.
1
To start the pressing sequence, press and hold the start button for at least one second.
Result
The hydraulic valve switches off the pressing sequence after the pressing operation has been completed. The end
of the pressing sequence is indicated by the motor switching off.
Summary of Contents for ACO 102
Page 2: ...A B C 1 2 1 2 D E F 1 2 1...
Page 158: ...158 B1024 001 01 2012 EN IEC 62079 2001 ACO 102 Geberit Mepla Geberit Mapress 30 15 Geberit...
Page 162: ...162 B1024 001 01 2012 LED LED LED LED LED LED LED...
Page 172: ...172 B1024 001 01 2012 EN IEC 62079 2001 ACO 102 Geberit Mepla Geberit Mapress 30 15 Geberit...
Page 174: ...174 B1024 001 01 2012 1 2 3 4 5 6 3 5 3 1 5 5 1 2 3 2 3 3 2 3 4 4 3 6 180 30 1 1 2 3 4 5 6...
Page 176: ...176 B1024 001 01 2012...
Page 186: ...186 B1024 001 01 2012 EN IEC 62079 2001 ACO 102 Geberit Mepla Geberit Mapress 30 15 Geberit...
Page 188: ...188 B1024 001 01 2012 1 2 3 4 5 6 3 5 3 1 5 5 1 2 3 2 3 3 2 3 4 4 3 6 180 30 1 1 2 3 4 5 6...
Page 190: ...190 B1024 001 01 2012...
Page 196: ...196 B1024 001 01 2012 1 180 A 2 B 3 180 C 1 2 D LED 1...
Page 200: ...200 B1024 001 01 2012 EN IEC 62079 2001 Geberit Mapress Geberit Mepla ACO 102 15 30 Geberit...
Page 201: ...B1024 001 01 2012 201 AE 12 5 4 3 2 1 1 2 3 4 5 12 240 19 IP 20 1 7 76 2 2 5 20 60 1 5 3 2 1 5...
Page 202: ...202 B1024 001 01 2012 1 2 3 4 5 6 1 2 3 4 5 6 5 3 3 1 5 5 1 2 3 3 2 3 3 2 4 3 4 6 180 30 1...
Page 203: ...B1024 001 01 2012 203 AE 1 A 180 2 B 3 C 180 1 2 D 1...
Page 204: ...204 B1024 001 01 2012...
Page 207: ...A B C 1 2 1 2 D E F 1 2 1...