16
Step 2
Long V rails
Insert three 2020*680mm long V rails to
their corresponding slots in the bottom
vertex.
Once in place, tighten the M4 screws to se
-
cure long V rails. (Figure 3.3)
Figure 3.3
Step 3
Wiring
Next, slide the wire attached to the limit
switch down the hole of the open beam
and guide the wire through the hole in the
vertex (Figure 3.4 & 3.5)
Repeat for remaining long V rails.
Figure 3.4
Figure 3.5
M4*10 screw
& M4 nut
Hole at bottom
of vertex
Summary of Contents for Kinematics
Page 1: ...KINEMATICS 3D PRINTER MANUAL ...
Page 2: ......
Page 3: ...3 ...