46
2014-07 · Doppelsitz-Bodenventil MT/T_R 08 (PMO) / Mixproof Bottom Valve MT/T_R 08 (PMO)
Datum/date
:
2013
-
07
-
01
221R
LI
00
7
301E
_
1
.
DOC
Manufacturer
’
s
We
l
ding
I
nstructions
(
WP
S
)
H
ous
i
ng
Conne
c
t
i
on
M
_
T
/
T
F
2
Ǝ
OD
– 4
Ǝ
OD
Location:
Büchen
Preparation
method:
mechanica
l
Manufacturer
’
s
we
l
ding
process:
141
(
TI
G
pu
l
se)
C
l
eaning
method:
brushing
or
pick
l
ing
R
eference
no
.
:
WPSM_
T
/06
-
082009
We
l
der:
certified
as
per
D
IN
E
N
287
-
1
;
AD
-
2000
-
Merkb
l.H
P3
Specifications
of
the
parent
meta
l
s:
1
.
4404/316L
T
he
minimum
tank
diameter
is
3000
mm
.
We
l
ding
process:
141
D
IN
E
N I
SO
4063
Workpiece
thickness
(mm):
t
=
2
mm
to
t
=
8
mm
T
ype
of
j
oint:
fi
ll
et
we
l
ds
inside
and
outside
Outside
diameter
“
B
”
(mm):
60,3
;
88,9
;
114,3
Preparation
of
j
oint:
zero
gap
between
f
l
ange
and
tank
We
l
ding
position:
1F
(gravity
position)
;
4F
(overhead)
Structure
of
the
j
oint
We
l
ding
procedure
W
e
l
d
i
ng
of
the
i
ns
i
de
and
outs
i
de
i
n
8
segments
W
e
l
d
t
y
pes
:
f
ill
et
we
l
ds
P
u
l
sed
ar
c
we
l
d
i
ng
i
s
the
on
ly
method
perm
i
tted
1
. I
nsert
the
tank
connection
into
the
ho
l
e
provided
in
the
tank
.
max
.
insertion
depth
Ǝ
k
Ǝ
=
4
mm
.
2
. T
acking,
first
on
the
inside,
then
outside,
working
diagona
ll
y,
8
times
with
fi
ll
er
3
.
Produce
fi
ll
et
we
l
d
on
the
inside
of
the
tank
with
fi
ll
er
in
segments
.
4
.
Produce
fi
ll
et
we
l
d
on
the
outside
of
the
tank
with
fi
ll
er
in
segments
.
We
l
d
bead
Process
Fi
ll
er
meta
l
[
mm
]
Current
[
A
]
Vo
l
tage
[
V
]
Current
type/
po
l
arity
of
e
l
ectrode
We
l
ding
speed
[
cm/min
]
Fi
ll
et
we
l
d
141
1,2
;
1,6
60
-
80
10
-
14
=
/
-
3
-
7
Fi
ll
er
meta
l
:
in
consu
l
tation
with
the
technica
l
expert
T
emperature
of
intermediate
l
ayer:
T<
30
°
C
Shie
l
ding
gas:
D
IN
E
N I
SO
14175
- I
1
F
l
ow
rates
[l
/min
]
:
Backing
gas:
D
IN
E
N I
SO
14175
- I
1
Shie
l
ding
gas:
13
-
15
Backing
gas:
10
-
20
Manufacturer:
Merhof
2011
-
08
-
31
..................................................................
Confirmation
of
exact
execution
by
processor:
………………………………………………………………..
N
ame,
date
and
signature
(We
l
der)
1
8
4
6
2
7
3
5
t
k
N
ame,
date
and
signature
(We
l
ding
Supervisor)
Summary of Contents for VARIVENT MT/T R 08
Page 2: ...2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...
Page 50: ...48 2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...
Page 51: ...49 2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...
Page 53: ...51 2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...
Page 54: ...52 2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...
Page 55: ...53 2014 07 Doppelsitz Bodenventil MT T_R 08 PMO Mixproof Bottom Valve MT T_R 08 PMO ...