49-5000640 Rev. 0
INST
ALLA
TION INSTRUCTIONS
Installing the Zoneline
3ODQIRUSURSHUHOHFWULFDOVXSSO\GUDLQVDQGGXFWZRUN
locations.
,QVWDOOWKHORXYHUDQGZDOOSOHQXP
,QVWDOODQGOHYHOWKHGUDLQSODWIRUP
&RPSOHWHFRQGHQVDWHGUDLQFRQQHFWLRQV
,QVWDOOXQLWWRZDOOSOHQXP
&RQQHFWWKHWRSGXFWZRUN
7. Connect the remote thermostat.
&RQQHFWDX[LOLDU\IHDWXUHVLIUHTXLUHG
0DNHHOHFWULFDOFRQQHFWLRQVWRXQLW
,QVWDOOILOWHU
5HYLHZWKHILQDOLQVWDOODWLRQFKHFNOLVW
7XUQSRZHURQ
$GMXVWDX[LOLDU\FRQWUROVHWWLQJVLIUHTXLUHG
INSTALLATION SUMMARY
1. Plan for proper electrical supply, drains and ductwork locations.
1.
Complete rough in plumbing for primary and secondary condensation drains.
2. Install the Louver and Wall Plenum
,QVWDOOWKHORXYHUWRWKHZDOOSOHQXP
Refer to instructions included in the louver kit
RAVAL4
for proper installation procedures.
$GMXVWGHSWKRIZDOOSOHQXPDQGLQVWDOOLQWRH[WHULRUZDOO
Refer to instructions included in the wall plenum kit
RAVWPT15B
for proper installation procedures.
INSTALLATION INSTRUCTIONS
3. Install and Level the Drain Platform
1.
5HIHUWRLQVWUXFWLRQVLQFOXGHGZLWK'UDLQ3ODWIRUPNLW5$9'3/$7IRUSURSHUSURFHGXUHIRUVXSSRUWDQG
LQVWDOODWLRQRISODWIRUPWRZDOOSOHQXP3ODWIRUPPXVWEHOHYHOLQDOOGLUHFWLRQV
Condensate Disposal System
7KH&RQGHQVDWH'LVSRVDO6\VWHPLQFUHDVHVHQHUJ\HIILFLHQF\XWLOL]LQJDIDFWRU\LQVWDOOHGIDQWKDWVOLQJVWKH
condensate onto the hot outdoor coil.
When high outdoor humidity prevents the slinger from disposing of all condensate, the excess condensate
RYHUIORZVLQWRWKHFRQGHQVDWHGUDLQSDQDQGRXWWKH´LQWHUQDOGUDLQFRQQHFWLRQV
NOTE: If the primary drain system fails to remove all of the condensate from the unit, any excess
condensate will overflow from the drain pan into the secondary drain (if connected), and drain outside
the building. This is your indication that the chassis or drain requires servicing.