Action
Step
The lid of the 1000 L mixer has two center openings. Make sure that the
powder addition port is inserted into the opening as shown in the following
illustration.
9
Adjust the lines through the rectangular lid openings.
10
If needed, clamp the fill lines and disconnect the liquid source.
11
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
235
7 Operation
7.4 Add liquid contents
Summary of Contents for Xcellerex XDM Series
Page 2: ...Page intentionally left blank...
Page 6: ...Page intentionally left blank...
Page 320: ...Page intentionally left blank...
Page 321: ...Page intentionally left blank...