Action
Step
Hold the mated connectors with one hand and push the end plug of the
probe sheath assembly inwards toward the disposable bag, compressing
the bellows section of the probe sheath assembly.
10
Result: The bellows section is fully compressed, as shown below.
176
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD
6 Preparation
6.4 Prepare and install the probes
6.4.4 Insert probes into the disposable bag
Summary of Contents for Xcellerex XDM Series
Page 2: ...Page intentionally left blank...
Page 6: ...Page intentionally left blank...
Page 320: ...Page intentionally left blank...
Page 321: ...Page intentionally left blank...