WattStation Pedestal Installation Manual
1155
G
GEE EEnneerrggyy
©
©22001122 G
GEE C
Coom
mppaannyy AAllll RRiigghhttss RReesseerrvveedd
SStteepp 1188:: Connect L1 and L2 to the
PDB – Power Distribution Block
and ground wire to the ground
lug shown in Figure 10.
SStteepp 1199:: The CAT5 cable is connected to the
Ethernet port. It is recommended to run 2
CAT5 cables if there are future or current
plans to support communication daisy
chaining of GE WattStation Pedestals
C
Caabbllee rreeeell
1.
Cable should not be extended beyond the red indicator line at the end of the cable.
Pulling beyond
this indicator
may cause the cable reel to bind, prohibiting retraction
.
2.
If
cable becomes bound due to over-extension, the following steps must be followed to retract the cable before
returning to normal operation
[2.1] Turn off the power
[2.2] Open the access door
[2.3]
Manually r
otate the cable
reel
in
a
counter-clockwise direction
until the cable is fully retracted.
[[22..44]] PPoow
weerr uupp tthhee uunniitt
aass nnoorrm
maall,, uunniitt
ccaann bbee rreettuurrnneedd ttoo nnoorrm
maall ooppeerraattiioonn
FFiigguurree -- 1100
FFiigguurree -- 1111
WARNING