WattStation Pedestal Installation Manual
1111
G
GEE EEnneerrggyy
©
©22001122 G
GEE C
Coom
mppaannyy AAllll RRiigghhttss RReesseerrvveedd
SStteepp 66 :: Using provided template locate the 4 holes.
See figure 2 for reference. Template must be
Removed after locating the holes
SStteepp 77:: Using a hammer drill and carbide tipped
drill bit, drill a hole (1/2” diameter) and at least
5 ½” to 6” deeper, see figure 3 for reference.
SStteepp 88:: Repeat step 7 for all remaining holes
SStteepp 99:: Clean out hole of all debris
SStteepp:: 1100 Install EVSE unit securely over Concrete
bed keeping conduits in center with four ½”-6”
anchor bolt holes on EVSE baseplate aligned
with concrete bed holes.
Check local codes to ensure compliance.
See figure 4 for reference.
FFiigguurree –– 22
FFiigguurree –– 33
FFiigguurree –– 44