Chapter 4. Inserting T17 Transducers into the Pipe
58
Model T17 Installation Guide
4.2.2 Mounting the Insertion Mechanism
To mount the insertion mechanism, complete the following steps:
1.
Refer to
below to familiarize yourself with the following insertion mechanism components:
•
Junction box
•
Barrel
•
Packing gland
•
Transducer
Note:
Explosion-proof junction boxes may not be mounted on the end of a transducer during shipment.
IMPORTANT:
For an
extended range
operation flow meter, the upstream and downstream transducers are different,
and it is crucial to flow meter operation that the correct transducer be installed in the correct location.
The
upstream transducer
has a 180° head and the
downstream transducer
has a 6° offset 174° head.
Also, the insertion mechanism and transducers have alignment marks.
Figure 67: Insertion Mechanism Assembly with T17 Transducer
Junction Box
Packing Gland
Barrel
Transducer