8 Monitoring & Control
P50 Agile P253
8-18
P253/EN M/C
Figure 11: TCS Scheme
When the breaker is closed, supervision current passes through opto input 1 and the trip coil. When
the breaker is open current flows through opto input 2 and the trip coil. No supervision of the trip path
is provided whilst the breaker is open. Any fault in the trip path will only be detected on CB closing,
after the elapse of
TCS timer
available under
CB CONTROL
menu.
2.11.1
Calculations for External Resistor
As shown in the TCS scheme, optional resistors R1 and R2 can be added to prevent tripping of the
CB if either opto input is shorted.
The minimum sensing current required by opto coupler is 0.18 mA and the maximum current capacity
of opto coupler is 10 mA. For the safe operation, the current should be always between minimum
required current and maximum current capacity of opto coupler. The maximum current is limited by
internal resistor (RInt.) connected in series with opto coupler. The value of this internal resistor (RInt.)
is 82 KΩ (Ohm).
The supervision current is a lot less than the current required by the trip coil to trip a CB. The opto-
input limits this supervision current .If the opto-input were to be short-circuited however; it could be
possible for the supervision current to reach a level that could trip the CB. For this reason, optional
resistors R1 and R2 are often used to limit the current in the event of a short-circuited opto-input. It is
recommended to use
2.5 KΩ / 50 W resistor for all type of auxiliary power supply.
2.12
Self-Diagnostic Features
The P253 relay includes a self-monitoring function to check the operation of its hardware and software
while in service. If there is a problem with the hardware or software, it is able to detect and report the
problem.
The relay continuously monitors the hardware and in the event detects any hardware fault/error;
corresponding error code is displayed on the LCD. These faults/errors are stored in the ‘
Main’t Rec
Num
= “and can be viewed from
Maint Record
submenu. Error log is stored as 16 bit integer.
As an example if RTC error occurs, error code/error log will be as under:
Error code :
0000 0000 0000 0100
Error log on LCD: 0004
If the error is cleared during the self-diagnostic procedure the corresponding error bit will be cleared.
The P253 internal errors are also indicated by a change in status of
ON
and
OUT OF SERVICE
LEDs.
For more details refer to the Troubleshooting chapter.
2.13
Watchdog Feature
The relay continuously monitors the healthiness of hardware and detects the hardware fault/error.
As soon as an internal fault is detected,
ON
LED changes from green to red and contact assigned to
‘
Relay OK’
signal will operate.
V01215
52A
52B
R1
Trip Output Relay
+ve
-ve
Opto-input 1
R2
Opto-input 2
Circuit Breaker
Trip path
Trip coil
Summary of Contents for P50 Agile P253
Page 3: ...P50 Agile P253 1 Introduction P253 EN M C 1 1 INTRODUCTION CHAPTER 1 ...
Page 4: ...1 Introduction P50 Agile P253 1 2 P253 EN M C ...
Page 11: ...SAFETY INFORMATION CHAPTER 2 ...
Page 12: ...Safety Information Pxxx 2 ...
Page 23: ...P50 Agile P253 3 Hardware Design P253 EN M C 3 1 HARDWARE DESIGN CHAPTER 3 ...
Page 24: ...3 Hardware Design P50 Agile P253253 3 2 P253 EN M C ...
Page 28: ...3 Hardware Design P50 Agile P253253 3 6 P253 EN M C E00276 Figure 2 Hardware design overview ...
Page 32: ...3 Hardware Design P50 Agile P253253 3 10 P253 EN M C ...
Page 33: ...P50 Agile P253 4 Front Panel P253 EN M C 4 1 FRONT PANEL CHAPTER 4 ...
Page 34: ...4 Front Panel P50 Agile P253 4 2 P253 EN M C ...
Page 39: ...P50 Agile P253 4 Front Panel P253 EN M C 4 7 Figure 2 USB port ...
Page 40: ...4 Front Panel P50 Agile P253 4 8 P253 EN M C ...
Page 41: ...P50 Agile P253 5 Configuration P253 EN M C 5 1 CONFIGURATION CHAPTER 5 ...
Page 42: ...5 Configuration P50 Agile P253 5 2 P253 EN M C ...
Page 154: ...5 Configuration P50 Agile P253 5 114 P253 EN M C ...
Page 155: ...P50 Agile P253 6 Protection Functions P253 EN M C 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Page 156: ...6 Protection Functions P50 Agile P253 6 2 P253 EN M C ...
Page 182: ...7 Protection Parameter Settings P50 Agile P253 7 2 P253 EN M C ...
Page 203: ...P50 Agile P253 8 Monitoring Control P253 EN M C 8 1 MONITORING CONTROL CHAPTER 8 ...
Page 204: ...8 Monitoring Control P50 Agile P253 8 2 P253 EN M C ...
Page 222: ...8 Monitoring Control P50 Agile P253 8 20 P253 EN M C ...
Page 223: ...P50 Agile P253 9 SCADA Communications P253 EN M C 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Page 224: ...9 SCADA Communications P50 Agile P253 9 2 P253 EN M C ...
Page 249: ...P50 Agile P253 10 Installation P253 EN M C 10 1 INSTALLATION CHAPTER 10 ...
Page 250: ...10 Installation P50 Agile P253 10 2 P253 EN M C ...
Page 260: ...11 Commissioning Instructions P50 Agile P253 11 2 P253 EN M C ...
Page 270: ...11 Commissioning Instructions P50 Agile P253 11 12 P253 EN M C ...
Page 272: ...12 Maintenance and Troubleshooting P50 Agile P253 12 2 P253 EN M C ...
Page 282: ...13 Technical Specifications P50 Agile P253 13 2 P253 EN M C ...
Page 292: ...13 Technical Specifications P50 Agile P253 13 12 P253 EN M C ...
Page 293: ...P50 Agile P253 14 Wiring Diagrams P253 EN M C 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Page 294: ...14 Wiring Diagrams P50 Agile P253 14 2 P253 EN M C ...
Page 297: ......