OEC 9800 Installation Procedure
16
Power ON System
1.
Place the C-Arm's keyswitch in the ON position (clock-wise) and then place the Workstation's power switch in the ON
position. Verify that the Workstation and C-Arm complete their software boot and initialization with no errors reported on the
displays.
2.
Verify that the Workstation's elapsed time meter is functional.
3.
Verify that the cooling fans are operating on both the Workstation and the C-Arm.