Intellix
™
BMT 330 User Manual
Page 12
BMT330UM
v1.0
20-Jun-16
ROUTINE USER-LEVEL OPERATIONS WITH Intellix
TM
BMT
330
Figure 1 shows a general
Single Transformer
installation layout with the sensor
connections required for the Intellix™ BMT 330. Figure 2 shows a general
Bank of 3
Single Phase Transformers
general installation layout.
The external LED provide information about the
Intellix™ BMT 330 status, please refer to
The transformer will be live during this process. Ensure
that you are aware of the safe working area and that
the Bushing Adaptor cables are undamaged as far as
can be observed before approaching the Intellix™ BMT
330 cabinet
If the equipment is used in a manner not specified by
the manufacturer, the protection provided by the
equipment may be impaired.
Before starting the configuration, confirm that all of
the Intellix™ BMT 330 sensors have been connected.
All user-access activity should take place in ambient
temperatures greater than -20 deg C (-4 deg F) to
prevent damage to connectors and cabling as they may
become brittle at extreme low temperatures.
Prior any test that requires the removal of the
transformer neutral ground, the CT MUST be removed if
installed. If so, replace the Neutral CT after the
transformer ground has been reconnected.
During user access: Note that this unit may have more
than one source of supply, eg the alarm relays may be
from an independent AC supply. Disconnect all supplies
at their source before servicing. Apply LOTO protocols.
Do not open the BMT 330 cabinet during rain or snow
storms.
CAUTION
WARNING
CAUTION
WARNING
CAUTION
WARNING
WARNING
WARNING