post startup checklist 17
prelube
pressure
maximum allowable working pressure (MAWP)
pulsations chart 92
rated discharge 54
pressure regulating valve (PRV) 69
preventative maintenance 97
priming
PRV.
See
pressure regulating valve (PRV)
pulsations
pressure 91
Q
R
rated discharge pressure 54
reapplication
compressor 56
record
gas compressor 18
relocation
compressor 56
report
rotation
run
running gear
rupture assembly 81
S
safety advisories
compressor operation 62
settings
cylinder discharge temperature shutdown 55
pressure 68
specifications
bearings and running gear 22
start the compressor 63
stop the compressor 65
support
system pressure
decrease 70
increase 70
T
technical support 6
temperature shutdown setting/formula 55
thermal growth 43
training schedule
low oil pressure 111
U
unbalance
inertia 90
V
valves
compressor 50
pressure regulating 69
variable volume clearance pocket
optional capacity control 101
required materials and tools 107
vibration
torsion 91
W
website
access for the first time 1
weights
4 | Index
Summary of Contents for H301 Series
Page 1: ...High speed reciprocating compressors H301 and 302 series operating manual GE Oil Gas ...
Page 10: ......
Page 17: ...H301 302 HSR Compressors Rev 2 2 7 ...
Page 18: ......
Page 30: ......
Page 48: ......
Page 61: ...H301 302 HSR Compressors Rev 2 2 51 ...
Page 62: ......
Page 76: ......
Page 98: ......
Page 103: ...H301 302 HSR Compressors Rev 2 2 93 ...
Page 104: ......
Page 114: ...104 Chapter 8 Maintenance Figure 21 Effective rod extension amount pocket is open ...
Page 120: ......
Page 129: ......
Page 130: ......
Page 135: ...H301 302 HSR Compressors Rev 2 2 5 ...
Page 137: ......