40 | Chapter 4: Installation
H I G H P R E S S U R E
DEPRESSURIZE THE COMPRESSOR PACKAGE BEFORE
PERFORMING MAINTENANCE.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145(f) (7)
L E T H A L G A S
VENT GAS
IMPROPER VENTING WILL RESULT IN SEVERE PERSONAL
INJURY OR DEATH.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145(f) (5)
H Y D R O G E N S U L F I D E ( H
2
S )
A FLAMMABLE, POISONOUS GAS WITH A CHARACTERISTIC
ODOR OF ROTTEN EGGS. DO NOT BREATHE IT IN.
Complies with ANSI Z535, ISO 3864, OSHA 1910.145(f) (5)
1. Verify that all vents and drains are functional and open as required.
2. Vented explosive gases or liquids must be piped away from the compressor,
either to skid edge or outside the building.
3. If the process gas is heavier than air, then vent and drain design must take this
into account.
4. In certain areas it may be necessary to install screens or sintered plugs over
vents and drains to prevent blockage, especially if the compressor may be
shut down for an extended period of time.
Secure the Skid and Foundation (Sub-Base)
Securely bolt the compressor skid to the to the base (foundation or steel frame
skid) of sufficient mass, stiffness and weight bearing capabilities. This is required to:
A. Prevent compressor movement and resist vibration due to unbalanced inertia
forces and couples that may be present. Compressor and driver reaction
forces are transmitted to the foundation.
Summary of Contents for H301 Series
Page 1: ...High speed reciprocating compressors H301 and 302 series operating manual GE Oil Gas ...
Page 10: ......
Page 17: ...H301 302 HSR Compressors Rev 2 2 7 ...
Page 18: ......
Page 30: ......
Page 48: ......
Page 61: ...H301 302 HSR Compressors Rev 2 2 51 ...
Page 62: ......
Page 76: ......
Page 98: ......
Page 103: ...H301 302 HSR Compressors Rev 2 2 93 ...
Page 104: ......
Page 114: ...104 Chapter 8 Maintenance Figure 21 Effective rod extension amount pocket is open ...
Page 120: ......
Page 129: ......
Page 130: ......
Page 135: ...H301 302 HSR Compressors Rev 2 2 5 ...
Page 137: ......