11
July 2018
GFK-3000A
7
Replacing the CapPack Module
The CapPack can be removed and replaced while
power is applied to the Energy Pack (hot swapped.)
CAUTION
When hot swapping CapPacks, do not
cycle power until the new CapPack is fully
charged and operational. Cycling power
before the STAT LED on the CapPack is solid
green can result in Controller memory not
being preserved.
Do not hot remove/insert the CapPack during
the firmware update process.
1.
Loosen the four screws on the CapPack and
carefully pull the CapPack off the base.
2.
Install the new CapPack on the base, first
engaging the module-to-base connectors
and then pressing the CapPack into place.
CAUTION
Over tightening the mounting screws could
crack the plastic housing.
3.
Use the four screws provided to secure the
CapPack to the base.
4.
When the CapPack is first inserted, the STAT
LED blinks green while the CapPack is
charging. Do not remove power to the
Energy Pack while the CapPack is charging
Summary of Contents for GFK-3000A
Page 17: ......