GFK-2958E
RSTi-EP User Manual November 2017
342
Commissioning
Warning
Explosion risk - Prior to starting work, make sure that there is not a
potentially explosive atmosphere.
Warning
During commissioning, the system may be manipulated to such an
extent that can result in risks to life and material damage.
Ensure that system components cannot start up unintentionally.
Caution
Conduct an insulation test before each commissioning (refer to the section,
General Contact Information
).
The procedures applied during commissioning depend on which control unit is being used on site.
The descriptions in this chapter use commissioning with a PROFINET network adaapter and the GE
Proficy Machine Edition as an example.
8.1
Requirements
Before you start the commissioning work, the following requirements must be fulfilled.
•
The control unit must be in operation.
•
The RSTi-EP station must be completely assembled and wired up.
•
The control unit and RSTi-EP station must be connected via fieldbus, and a PC/laptop must
also be connected.
•
The power supply must be turned on.
If these requirements are fulfilled, the following LEDs light up:
•
On the bus network adapter
o
The PWR LED lights up green.
o
For the port to which the control unit is connected, the LINK LED lights up green and
the ACT LED lights up yellow.
•
On the modules, the Status LED lights up green.
Summary of Contents for GFK-2958E
Page 1: ...RSTi EP User Manual GFK 2958E November 2017 ...
Page 23: ...Chapter 1 Introduction GFK 2958E RSTi EP User Manual 19 Notes ...
Page 56: ...Chapter 3 Configuration GFK 2958E RSTi EP User Manual 52 Notes ...
Page 183: ...Chapter 5 Detailed Descriptions of I O Modules GFK 2958E RSTi EP User Manual 179 EP 5111 ...
Page 184: ...Chapter 5 Detailed Descriptions of I O Modules GFK 2958E RSTi EP User Manual 180 EP 5111 ...
Page 316: ...Chapter 5 Detailed Descriptions of I O Modules GFK 2958E RSTi EP User Manual 312 Notes ...
Page 330: ...Chapter 6 Installation GFK 2958E RSTi EP User Manual 326 Notes ...
Page 344: ...Chapter 7 Earthing and Shielding GFK 2958E RSTi EP User Manual 340 ...
Page 345: ...Chapter 7 Earthing and Shielding GFK 2958E RSTi EP User Manual 341 Notes ...
Page 385: ...Chapter 8 Web Server GFK 2958E RSTi EP User Manual 381 Notes ...
Page 401: ...Chapter 11 Disassembly and Disposal GFK 2958E RSTi EP User Manual 397 Notes ...
Page 413: ...Chapter 12 LED Indicators and Troubleshooting GFK 2958E RSTi EP User Manual 409 Notes ...
Page 416: ...Chapter 14Accessories and Replacement Parts GFK 2958E RSTi EP User Manual 412 Notes ...