Issue 1
4-4 Pressure indicator operation (MC 620)
K0449 - [EN] English
•
When all the software selections are complete, make the
applicable pressure and electrical connections. Examples:
Measure pressure (
Section 4.4.4
)
4.4.2
Set up a Leak Test
1) Set the Utility
Set the
Utility
to
Leak Test
(
Section 2.10.6
).
2) Set the Leak Test
options
When you have set the
Utility
to
Leak Test
, you can set these
options:
Wait Time:
The time before the test starts in
hours:minutes:seconds (hh:mm:ss)
Test Time:
The period of the leak test in
hours:minutes:seconds (hh:mm:ss)
Note:
To set the Leak Test options, you must have a pressure
module correctly installed (
Section 4.2.1
).
2
1
3
4
Select Leak Test
Select Test Time
Steps 5 and 6: Set the Test Time
+ Set the Wait Time (if necessary)
TAP the window
(Maximise)
Select Settings
5
6
7
Start the test and let it
complete.
Go back to the Home window. Start the test
when the pressure system is set up.
Stop the test (with no results)
Summary of Contents for Druck DPI 620
Page 8: ...Issue 1 viii About this manual K0449 EN English ...
Page 18: ...Issue 1 1 6 Instrument parts accessories and options K0449 EN English ...
Page 38: ...Issue 1 2 20 Prepare the instrument K0449 EN English ...
Page 52: ...Issue 1 3 14 Electrical and IDOS operations K0449 EN English ...
Page 60: ...Issue 1 5 2 Instrument communications K0449 EN English ...
Page 64: ...Issue 1 6 4 Datalog operation K0449 EN English ...
Page 68: ...Issue 1 7 4 Documenting functions K0449 EN English ...
Page 80: ...Issue 1 9 2 Maintenance procedures K0449 EN English ...
Page 82: ...Issue 1 10 2 General specification K0449 EN English ...
Page 83: ...Customer service Visit our web site www gesensinginspection com ...
Page 84: ......