Modifications reserved
Pagina 65/90
OPM_SPE_XXX_60K_60K_7GB_V010.doc
Operatine Manual
SitePro 60 kVA
5. Close the output switch Q1.
The UPS output terminals must be supplied by the mains power through the automatic bypass.
The LCD display must indicate the status “
LOAD ON BYPASS
”.
Now the control panel should indicate a normal situation (No alarms).
LED
“service check”
is OFF.
LEDs
1, 2, 3, 4b, 7
and
8
light up.
LEDs
4a, 5, 6
and
9
are OFF.
6. Inverter start.
Press the key
"I"
on the control panel.
The
inverter
will start up.
LED 5
(inside inverter symbol) must be blinking.
In a short time, when the inverter voltage is confirmed, the LED will stop blinking and stay fixed lit.
The load will be automatically transferred from mains to inverter.
LEDs
1, 2, 3, 4b, 5, 6
and
8
are now lit.
LEDs
4a, 7
and
9
are OFF.
The LCD panel must display the main screen, indicating the status
“LOAD ON INVERTER”
and the
value of the battery reserve.
7. Load supply.
Your
SitePro
UPS is now running, supplying power to the output.
Insert the loads one by one to the output of the UPS.
Check the output current value of
L1
,
L2
and
L3
and check for correct load balance.
8. Operation mode selection
.
SitePro
is delivered normally selected for permanent
VFI
operation.
SEM
mode can be enabled and the
SEM START
time &
SEM STOP
time can be programmed for each
day of the week (see
Section 7.5-7
).
NOTE !
The
Battery
must be charged for at least 10 hours, in order to ensure the full
backup runtime in case of a
Mains Failure
.