C30 CONTROLLER SYSTEM – INSTRUCTION MANUAL
3-1
C30 Controller System
Chapter 3: Installation
Installation
This chapter outlines installation of hardware and software. You unpack, check, mount, and wire the unit, then install the
software and configure settings.
3.1 Unpack and inspect
Use this procedure to unpack and inspect the unit.
1.
Open the relay package and check that the following items have been delivered:
–
C30
–
Mounting screws
–
GE EnerVista™ DVD (software and documentation)
–
C30 Instruction Manual (soft copy on DVD; printed copy if ordered)
–
UR Family Communications Guide (soft copy on DVD; printed copy if Instruction Manual ordered)
–
Certificate of Calibration
–
Test Report
–
EC Declaration of Conformity
2.
Inspect the unit for physical damage.
3.
View the rear nameplate and verify that the correct model has been delivered. The model number is at the top right.
4.
For any issues, contact GE Grid Solutions as outlined in the For Further Assistance section in chapter 1.
5.
Check that you have the latest copy of the C30 Instruction Manual and the UR Family Communications Guide, for the
applicable firmware version, at
http://gegridsolutions.com/multilin/manuals/index.htm
The Instruction Manual outlines how to install, configure, and use the unit. The Communications Guide is for advanced use
with communication protocols. The warranty is included at the end of this instruction manual and on the GE Digital Energy
website.