BREAKER FAILURE AND 50 UNITS TEST
This test should be done for each one of the positions and both bus bars.
Check that the stabilization resistors are shortened.
Set the adjustment 50 of the position to 100% and BF to 0.9 A and the time of B.F. to 0.4 s, that is first step
100ms (all switches on SFI module should be on the left), second step 300ms (switches on DTE module,
common for all positions).
Set up the latching relay of bus A (89AX/P) to the ON position (see table 2: Bar connection & disconnection)
that of bus B (89BX/P) in the OFF position (see table 2: Bar connection & disconnection), put a jumper
between terminals (see table 6: Compound blocking contacts), initiate the breaker failure protection by
apP to the terminal (see table 4: Breaker failure initiation) of this position and apply 0.9 A of current
through the corresponding terminals of this position (see table 1: Input current) and checking that:
•
The differential does not trip;
•
The 50 trips with 0.9 A;
•
The B.F. trips with 0.9 A and at 0.4 s;
•
When testing bar A check that there is voltage in X5 (+P) after 100ms (first step) and in X9 after 300ms
(second step).
•
When testing bar B check that there is voltage in X6 (+P) after 100ms (first step) and in X10 after 300ms
(second step).
•
Both LEDs are red;
•
Contacts X25-X26 and X27-X28 are closed for Bar A and contacts X37-X38 and X39-X40 are closed for
Bar B.
•
the restraint measured in the corresponding terminal of the differential module is 0.9;
•
contacts (see table 3: breaker failure tripping output contacts) of the position are closed;
Apply the same current through phase 2 (see table 1) and phase 3 (see phase 1).
Disconnect the latching relay of bus A (89AX/P) of the position tested, apP to terminal (see table 2:
Bar connection & disconnection)
of the position. Connect the latching relay of bus B (89BX/P) to the
position, applying poP to terminal (see table 2: Bar connection & disconnection) of the position.
Set the line latching relays of the next position and repeat the whole process for every position. Repeat the
above steps for bar B.
TABLE 1: INPUT CURRENT FOR ALL POSITIONS
Phase A
Phase B
Phase C
23-26
24-26
25-26
TABLE 2: BAR CONNECTION & DISCONNECTION FOR ALL POSITIONS
BAR A
BAR B
ON
OFF
ON
OFF
12
13
14
15
Summary of Contents for BUS1000
Page 6: ......
Page 8: ......
Page 34: ...5 HARDWARE DESCRIPTION 5 10 BUS1000 Busbar Protection GEK 98514B ...
Page 36: ...6 RECEIVING HANDLING AND STORAGE 6 2 BUS1000 Busbar Protection GEK 98514B ...
Page 54: ...8 FINAL INSTALLATION AND COMMISSIONING 8 4 BUS1000 Busbar Protection GEK 98514B ...
Page 56: ...9 TESTS AND PERIODICAL MAINTENANCE 9 2 BUS1000 Busbar Protection GEK 98514B ...
Page 66: ...10 FIGURES 10 10 BUS1000 Busbar Protection GEK 98514B ...
Page 74: ...11 DIMENSIONS 11 8 BUS1000 Busbar Protection GEK 98514B FIGURE 23 CABINET 226B2211F21 ...
Page 104: ...13 SCHEMATICS DOUBLE BUSBAR 13 16 BUS1000 Busbar Protection GEK 98514B ...