![background image](http://html.mh-extra.com/html/ge/as0cd09-series/as0cd09-series_technical-service-manual_2198768018.webp)
16
Test Mode
Test operation will be performed by pushing the “TEST KEY” on the main PWB Assy,as listed below.
(1)Indoor
One push: Ignore communication error.
Twice push: Shorten the proceeding time (1 min---1sec)
3 Times Push: Shorten the proceeding time. (1hour---1sec)
4 Times push: All LED ON
5 Times push: Up/Down Step Motor ON.
6 Times push: Right Step Motor ON. (Not on all Models)
7 Times push: Left Step Motor ON. (Not on all Models)
8 Times push: Negative Ion ON. (Not on all Models)
9 Times push: Reset.
NOTE:
For normal operation after checking by test mode, you should reset the main power.
(2) Outdoor
One push: Ignore communication error.
Twice push: Comp. ON, Outdoor Fan ON
Reversing Valve Coil OFF
Crank Case Heater Coil OFF
3 Times push: Comp. ON, Outdoor Fan ON
Reversing Valve Coil OFF
Crank Case Heater Coil OFF
4 Times Push: Same
5 Times Push: Error LED (Red) ON
6 Times push: Comp Off, Outdoor FAN OFF
7 Times push: Reset
NOTE:
For normal operation after checking by test mode, you must reset the main power.
Perform using remote
(Every 3 seconds the Green led will blink ---OK)
Summary of Contents for AS0CD09 Series
Page 2: ......
Page 45: ...43 5 When Indoor Fan does not operate ...
Page 47: ...45 7 When a communication error occurs ...
Page 48: ...46 8 Indicators in case of connecting error INDOOR ...
Page 50: ...48 9 Voltage of Connectors according to Indoor Fan speed ...
Page 54: ...52 ...
Page 55: ...53 ...
Page 56: ...54 ...
Page 57: ...55 ...
Page 58: ...56 Ω Ω Ω Ω Ω Ω Ω Ω Ω ...
Page 59: ...57 ...
Page 60: ...58 ...
Page 61: ...59 ...
Page 62: ...60 ...
Page 63: ...61 ...
Page 65: ...63 Illustrated Parts Catalog ...
Page 66: ...64 Illustrated Parts Catalog ...
Page 68: ...66 Illustrated Parts Catalog ...
Page 69: ...67 Illustrated Parts Catalog ...
Page 71: ...69 Illustrated Parts Catalog ...
Page 72: ...70 Illustrated Parts Catalog ...