Step
Action
8
Tighten the bolts to raise the lower crossbeam at the back of the system.
9
Remove the bottom leverage blocks.
Tip:
You may need to use a hammer to remove the leverage blocks.
10
Remove the lower crossbeam and the support blocks under the system.
11
Position the ramp against the crate floor at the back of the system. Secure
the ramp to the crate floor with a bolt, then carefully maneuver the system
down the ramp.
Note:
Two persons should work together to carefully control the movement and
direction of the system down the ramp, while one person carefully pushes
the system from inside the crate.
4 Installation
4.2 Transport and moving of the system
80
ÄKTA ready XL Operating Instructions 29281616 AE
*** TeDIS Valid on Date Printed Printed on: 15-09-2023 11:27:35 ***