
—
49
—
8.3
Disassembly procedures for outdoor unit 25, 32
Suitable for PRO AIR 109 IN / PRO AIR 109 OUT, PRO AIR 112 IN / PRO AIR 112 OUT
Operation procedures/pictures
Disassembling the top cover
Screw off the one piece of fixing screw that fixes
the handle with screwdriver and push down with
strength to take out the handle.
Screw off the 3 pieces of screws around the top
cover and then lift it upward to take out the top
cover as shown in Fig.8-25.
Disassembling the net cover
Unscrew 4 tapping screws in the screen
enclosure, and remove the screen enclosure as
shown in Fig.8-26.
Disassembling panel
sub-assembly
Unscrew the 5 tapping screws at the valve
support chassis and sideboard of the condenser
to take off panel assembly as shown in Fig.8-27.
Top cover Screw Screw Handle
Fig.8-25
Screw
Net cover
Fig.8-26
Panel
Screw
Fig.8-27
Summary of Contents for AIR 326
Page 2: ... 1 Summary and features Model Remark PRO AIR 107 IN PRO AIR 107 OUT 1Ph 230V 50Hz R410A 1 ...
Page 4: ... 3 Model Remark PRO AIR 218 IN PRO AIR 218 OUT 1Ph 230V 50Hz R410A ...
Page 5: ... 4 Model Remark GE AIR 326 IN1 GE AIR 326 IN2 GE AIR 326 OUT 1Ph 230V 50Hz R407C ...
Page 6: ... 5 Model Remark GE AIR 428 IN GE AIR 428 OUT 1Ph 230V 50Hz R407C ...
Page 20: ... 19 4 2 Outline and installation dimensions of indoor unit 20 Handle 60cm Bolt Nut Spanner ...
Page 71: ... 70 Explosive view and parts list Explosive view of parts and components of indoor unit 9 ...
Page 75: ... 74 Explosive view of parts and components of outdoor unit ...
Page 77: ... 76 Explosive view of parts and components of outdoor unit frequency converter ...
Page 79: ... 78 Explosive view of parts of outdoor unit one driving two ...
Page 81: ... 80 Explosive view of parts of outdoor unit one driving three ...
Page 83: ... 82 Explosive view of parts of outdoor unit one driving four ...
Page 101: ... 100 ...