background image

Installation Preparation

7

Preparation 

WITHOUT

 an Accessory Storage Drawer

PREPARE THE OPENING 

(CONT.)

Installation over a GE/Monogram Oven and 

Warming Drawer:

NOTE:

 Additional clearances between the cutouts 

may be required. Check to be sure the oven 

supports above the Warming Drawer location do 

not obstruct the required interior depth and height. 

See Warming Drawer installation instructions for 

details.

 CAUTION:

 

For personal safety, the 

mounting surface must be capable of supporting 

the cabinet load, in addition to the added weight 

of this approximate 80-pound oven, plus additional 

oven loads of up to 50 pounds or a total weight  

of 130 pounds.

PRECAUCIÓN:

 Para seguridad 

personal, la superficie de montaje debe poder 

soportar la carga del gabinete, además del peso 

aproximado de 80 libras del horno, más las 

cargas adicionales del horno de hasta 50 libras  

o un peso total de hasta 130 libras.

Construct 

Solid Bottom 

Min. 3/8” 

Plywood 

Supported by  

2x4 or 2x2 

Runners all  

Four Sides

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.

Per Oven 

Requirement

45-1/4” 

Min.

Per warming drawer requirement

2” Min.  
(3” recommended)

PREPARE THE OPENING 

(CONT.)

Installation over a GE/Monogram Oven:

‡,I\RXDUHUHSODFLQJD*(0RQRJUDPHOHFWULF

double oven with the combined installation of  

an Advantium 240V and a single oven, use the 

dimensions shown. The middle rail separating  

the two openings may need to be larger than  

the 2” minimum shown.

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.  
(3” recommended)

45-1/4”

Min.

Construct Solid 

Bottom Min. 

3/8” Plywood 

Supported by  

2x4 or 2x2 

Runners all  

Four Sides

Per Oven 

Requirement

Summary of Contents for Advantium ZSC2201JSS

Page 1: ......

Page 2: ...nical and electrical skills Completion Time 1 Hour Proper installation is the responsibility of the installer Product failure due to improper installation is not covered under the warranty See Owner s...

Page 3: ...aci n incorrecta Ver el Manual del Propietario para informaci n sobre la garant a IMPORTANTE Utilice este horno s lo con el objetivo para el que fue creado Nunca use el horno para entibiar o calentar...

Page 4: ...ke sure to use the correct cutout when preparing the opening NOTE Model ZSC2202 CANNOT be installed with an accessory storage drawer See Installation Preparation Without an Accessory Storage Drawer fo...

Page 5: ...s DO NOT use for grounding DO NOT ground to a gas pipe DO NOT have a fuse in the NEUTRAL or GROUNDING circuit A fuse in the NEUTRAL or GROUNDING circuit could result in an electrical shock Check with...

Page 6: ...er a 30 wide single oven cabinet or cut the opening in a wall to the dimensions shown OZD V PDLQWDLQ PLQLPXP KHLJKW IURP the floor to the cutout in any single or combined installation OORZ FDVH WULP R...

Page 7: ...al la superficie de montaje debe poder soportar la carga del gabinete adem s del peso aproximado de 80 libras del horno m s las cargas adicionales del horno de hasta 50 libras o un peso total de hasta...

Page 8: ...single oven cabinet or cut the opening in a wall to the dimensions shown For existing cutouts a maximum width of 28 1 2 is acceptable If the opening is slightly wider secure a furring strip on each s...

Page 9: ...pounds or a total weight of 160 pounds PRECAUCI N Para seguridad personal la superficie de montaje debe poder soportar la carga del gabinete adem s del peso aproximado de 80 libras del horno y las 30...

Page 10: ...Q 1 REMOVE THE PACKAGING AND PARTS Owner s Manual Owner s Manual Installation Instructions Glass Tray Metal Grill Tray Metal Trays 2 Turntable Ring Bottom Trim Rack 6 Brass Screws 3 required 3 extra I...

Page 11: ...IR N DA OS With oven in front of the cabinet opening Insert conduit into cabinet opening Connect oven wiring and branch circuit Lift the oven into the opening while continuing to feed the conduit in t...

Page 12: ...e sure that the oven is centered in the opening Open the door place a turntable tray in the oven and make sure that the tray in the unit is level Drill pilot holes through the side flanges Drive the c...

Page 13: ...appliance requires basic mechanical skills COMPLETION TIME One hour with the installation of an Advantium 240V oven Proper installation is the responsibility of the installer Product failure due to im...

Page 14: ...in Step C E The oven and storage drawer assembly is now ready to be installed Return to the Advantium 240V Built In SpeedCook Oven Installation Instructions to complete the installation 2 ASSEMBLING T...

Page 15: ...15 Notes...

Page 16: ...asses or goggles should be worn NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice GE Applianc...

Reviews: