background image

6

Installation Preparation

Preparation 

WITHOUT

 an Accessory Storage Drawer

PREPARE THE OPENING 

(CONT.)

Installation over a GE/Monogram  

Warming Drawer:

NOTE:

 Additional clearances between the cutouts 

may be required. Check to be sure the oven supports 

above the Warming Drawer location do not obstruct 

the required interior depth and height. See Warming 

Drawer installation instructions for details.

30”

23-1/2”

25-1/4”

17-1/2”

36-3/4”

Min.

2” Min.  
(3” recommended)

Per warming 

drawer 

requirement

Construct  

Solid Bottom  

Min. 3/8” 

Plywood 

Supported  

by 2x4 or 2x2 

Runners all  

Four Sides

PREPARE THE OPENING

The Advantium 240V can be installed in 

combination with other GE/Monogram appliances. 

Always follow each product’s Installation 

Instructions to complete the installation.

Single Advantium 240V Installation:

Order a 30” wide single oven cabinet or cut the 

opening in a wall to the dimensions shown.

‡$OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP

the floor to the cutout in any single or combined 

installation.

‡$OORZµFDVHWULPRYHUODSRQWKHVLGHVDQG

7/8” overlap on the bottom of the opening for 

all models. Allow 1-1/4” case trim overlap on the 

top for models PSB9120 and 3/4” overlap on the 

top for models ZSC2200, ZSC2200, ZSC2201 and 

ZSC2202.  

‡2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV

of the opening.

When installed over a single oven or a warming 

drawer, allow at least 2” between the two openings. 

This separation will provide clearance for bottom 

overlap of the Advantium 240V and the other 

appliance overlaps.
Construct a solid oven floor of 3/8” min. thick plywood 

supported by 2 x 4  or 2 x 2 runners on all sides.

‡7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG

flush with the bottom edge of the cutout.

30”

23-1/2”

25-1/4”

17-1/2”

Construct  

Base  

Min. 3/8” 

Plywood 

Supported  

by 2x4 or 

2x2 Runners 

all Four 

Sides

36-3/4”

Min.

Summary of Contents for Advantium ZSC2201JSS

Page 1: ......

Page 2: ...nical and electrical skills Completion Time 1 Hour Proper installation is the responsibility of the installer Product failure due to improper installation is not covered under the warranty See Owner s...

Page 3: ...aci n incorrecta Ver el Manual del Propietario para informaci n sobre la garant a IMPORTANTE Utilice este horno s lo con el objetivo para el que fue creado Nunca use el horno para entibiar o calentar...

Page 4: ...ke sure to use the correct cutout when preparing the opening NOTE Model ZSC2202 CANNOT be installed with an accessory storage drawer See Installation Preparation Without an Accessory Storage Drawer fo...

Page 5: ...s DO NOT use for grounding DO NOT ground to a gas pipe DO NOT have a fuse in the NEUTRAL or GROUNDING circuit A fuse in the NEUTRAL or GROUNDING circuit could result in an electrical shock Check with...

Page 6: ...er a 30 wide single oven cabinet or cut the opening in a wall to the dimensions shown OZD V PDLQWDLQ PLQLPXP KHLJKW IURP the floor to the cutout in any single or combined installation OORZ FDVH WULP R...

Page 7: ...al la superficie de montaje debe poder soportar la carga del gabinete adem s del peso aproximado de 80 libras del horno m s las cargas adicionales del horno de hasta 50 libras o un peso total de hasta...

Page 8: ...single oven cabinet or cut the opening in a wall to the dimensions shown For existing cutouts a maximum width of 28 1 2 is acceptable If the opening is slightly wider secure a furring strip on each s...

Page 9: ...pounds or a total weight of 160 pounds PRECAUCI N Para seguridad personal la superficie de montaje debe poder soportar la carga del gabinete adem s del peso aproximado de 80 libras del horno y las 30...

Page 10: ...Q 1 REMOVE THE PACKAGING AND PARTS Owner s Manual Owner s Manual Installation Instructions Glass Tray Metal Grill Tray Metal Trays 2 Turntable Ring Bottom Trim Rack 6 Brass Screws 3 required 3 extra I...

Page 11: ...IR N DA OS With oven in front of the cabinet opening Insert conduit into cabinet opening Connect oven wiring and branch circuit Lift the oven into the opening while continuing to feed the conduit in t...

Page 12: ...e sure that the oven is centered in the opening Open the door place a turntable tray in the oven and make sure that the tray in the unit is level Drill pilot holes through the side flanges Drive the c...

Page 13: ...appliance requires basic mechanical skills COMPLETION TIME One hour with the installation of an Advantium 240V oven Proper installation is the responsibility of the installer Product failure due to im...

Page 14: ...in Step C E The oven and storage drawer assembly is now ready to be installed Return to the Advantium 240V Built In SpeedCook Oven Installation Instructions to complete the installation 2 ASSEMBLING T...

Page 15: ...15 Notes...

Page 16: ...asses or goggles should be worn NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice GE Applianc...

Reviews: