AR-24 User Manual
Installation 2-3
Step 2
Place the beam upright on the left / right side vertical stand, and tighten the roll hold supports
to the vertical stands and beam with screws-L and flat washers. (Figure 2-1)
Step 3
Position the assembled stands perpendicularly, and tighten the assembled vertical stands to
the bottom stands with screw-L and flat washer. (Figure 2-2)
Vertical stand
Stand beam
Figure 1
Figure 2
Screw-L
+ Flat washer
Screw-L
+ Flat washer
Bottom stand
Roll holder
support