Operation
ORCA-I SP Operation Manual
3-26
© GBC Pro-Tech 1998 April
352&(66&21752/&+$57
Vinyl Transfer (First Pass)
Product: _____________
Process: Vinyl Transfer (1st Pass) ______________
Date:__________
Material Top: ________________________
Material Bottom: ______________________________
Other Material: ______________________________________________________________________
Special Instructions:___________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
CONTROL SETTINGS
Speed: 1-3 fpm (0.3-0.9 m/min)
Reverse/Forward: Forward
Main Roll Up/Down: Down
Main Roll Pressure: 90-120 psi (619-825 kPa)
Top Heater On/Off: On
Top Temp. Set: 290 °F (143 °C)
Bottom Heater On/Off: On
Bottom Temp. Set: 32 °F (0 °C)
Main Roll Shim Dials: 0
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 50-60 psi (344-413 kPa)
Pull Roll Up/Down: Down
Pull Roll Pressure: 70 psi (481 kPa)
Pull Roll Shim Dials: 0
Cooling: On
See Diagram 3-8A for Webbing Outline
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500