Operation
ORCA-I SP Operation Manual
3-24
© GBC Pro-Tech 1998 April
352&(66&21752/&+$57
Product: _____________
Process: 2-Pass Cold Mount/Cold Laminate (2nd Pass)Date: ________
Material Top: ________________________
Material Bottom:3/16 Foamcore __________________
Other Material: ______________________________________________________________________
Special Instructions:___________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
CONTROL SETTINGS
Speed: 3-4 ft/min (1-1.2 m/min)
Reverse/Forward: Reverse
Main Roll Up/Down: Up
Main Roll Pressure: --
Top Heater On/Off: Off
Top Temp. Set: --
Bottom Heater On/Off: Off
Bottom Temp. Set: --
Main Roll Shim Dials: --
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 80 psi (550 kPa)
Pull Roll Up/Down: Up
Pull Roll Pressure: 60 psi (413 kPa)
Pull Roll Shim Dials: 3/16
Cooling: Off
See Diagram 3-7A for Webbing Outline
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500