
ORCA-I Operation Manual
Operation
GBC Pro-Tech 1997 October
3-23
352&(66 &21752/ &+$57
Product:______________Process:_2-Pass Cold Mount/Cold Laminate (2nd Pass) Date: ____
Material Top:___________________________Material Bottom:_3/16 Foamcore___________
Other Material: ______________________________________________________________
FRONT CONTROL SETTINGS
Speed: 3-4 ft/min (1-1.2 m/min)
Reverse/Forward: Reverse
Main Roll Up/Down: Up
Main Roll Pressure: --
Top Heater On/Off: Off
Top Temp. Set: --
Bottom Heater On/Off: Off
Bottom Temp. Set: --
Main Roll Shim Dials: --
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 80 psi (550 kPa)
Pull Roll Up/Down: Up
Pull Roll Pressure: 60 psi (413 kPa)
Pull Roll Shim Dials: 3/16
Cooling: Off
See Diagram 3-7a for Webbing Outline
Special Instructions: __________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500