42
Chapter 4: Installing Components
www.gateway.com
Opening the server case
Because the components inside your server are extremely sensitive to static
electricity, make sure that you follow the instructions at the beginning of this
chapter to avoid static electricity damage.
To open the server case:
1
Follow the instructions in
“Preventing static electricity discharge” on
page 41
.
2
Turn off the server, then disconnect the power cord and all other cables
connected to the server.
3
Unlock the front cover.
4
Press the two front cover release latches, then pull the cover away from
the server.
Warning
For correct cooling and air flow, always reinstall the side
panel and the air duct (if included) before you turn on the
server. Operating the server without the cover in place can
damage server components.
Release latch
Lock
Release latch
Summary of Contents for 960
Page 1: ......
Page 2: ......
Page 6: ...iv ...
Page 9: ...3 Front www gateway com Hot swap drives PCI card fan ...
Page 24: ...18 Chapter 2 Setting Up Your Server www gateway com ...
Page 98: ...92 Chapter 5 Using the BIOS Setup Utility www gateway com ...
Page 126: ...120 Chapter 6 Troubleshooting www gateway com ...
Page 136: ...130 Appendix A www gateway com ...
Page 157: ...A MAN 960 SYS GDE R1 12 02 ...