![Gasboy 9820 Installation Instructions Manual Download Page 1](http://html1.mh-extra.com/html/gasboy/9820/9820_installation-instructions-manual_3668581001.webp)
MDE-4864B Gasboy® 9820 Pump Interface Kits Installation Instructions · March 2022
Page 1
Introduction
Purpose
This document provides installation instructions for Gasboy
®
9820 Pump Interface Kits,
C07057 Single/Dual Pulse out or C07092 RS485 Communications.
Table of Contents
Topic
Page
Important Safety Information
3
Installation of the Gasboy 9820 Pump Interface Kit
Pulse-out I/F Board (M06587A001) Jumper Settings
Required Tools
The following tools are required for the installation of the kit:
• Flat-tip Screwdriver
• Cross-tip
Screwdriver
• Standard Socket set
Parts List
The following table lists the parts included in the Pump Interface Kits,
Sr. No. Description
Part Number
Quantity
C07057
C07092
1
PCA, Atlas 9800 Pulse Out Interface W/Totalizer
M06587A001
1
-
2
PCA, Atlas 9800 RS-485 Interface
M06725A001
-
1
3
Standoff, M/F #6-32 X 3/4” Lg
C08381
2
2
4
Washer, Lock #6 Ext. Tooth
G068843
2
2
5
Screw, Sems Ph Phil 6-32 X 3/8 Stl Zn Pl
Q12083-13
2
2
6
Cable Assy, Opt.Comm TB-9820RR
C06678
1
1
7
Screw, Mh Pnh Phl 8-32 X .625 Stl Zn Pl
Q11270-55
2
2
8
Washer, Lk #8 Reg Sst
K73278-33
2
2
C07057 and C07092:
MDE-4864B
Gasboy
®
9820 Pump Interface Kits
Installation Instructions
March 2022