
36
37
GB
NOTE ! Each purlin has been designed to fit perfectly to the walls.
Check the inclination of each purlin to ensure it’s in correct position.
Reinforce the construction with 4 ridge battens (part S) fixed from the inside to the front and
back wall using M8x60 screws. These parts should be screwed after tightening the side,
front and back walls of the garden house.
NOTE :
4
the ridge battens should be screwed only to the lower board at the very bottom and to
the first board at the top;
4
M8x60 screws shouldn’t be over tightened to give the boards ability to work.
⑥
6. DOOR ASSEMBLY
CODES
PART DESIGNATION
DIMENSIONS (MM)
QTY
I
Right door and left door (partially glazed)
720 x 1630 mm
2
Place the two doors (part I) on the hinges.
I
I
I
I
I1
I1
I2
I3
Summary of Contents for 22191
Page 8: ...8 FRANÇAIS INFORMATIONS SUR LA DEMANDE DE TRAVAUX ...
Page 12: ...12 FRANÇAIS POSE DE LA BASE OUTILS NÉCESSAIRES A A H1 H1 B ...
Page 27: ...27 GB INFORMATION ON THE ASSEMBLY AUTHORISATION ...
Page 31: ...31 GB MOUNTING THE BASE REQUIRED TOOLS A A H1 H1 B ...
Page 46: ...46 DEUTSCH INFORMATIONEN FÜR DEN BAUANTRAG ...
Page 50: ...50 DEUTSCH AUFBAU DER BASIS BENÖTIGTES WERKZEUG A A H1 H1 B ...
Page 65: ...65 ES INFORMACIÓN SOBRE LA SOLICITUD DE TRABAJO ...
Page 69: ...69 ES LA COLOCACIÓN DE LA BASE HERRAMIENTAS NECESARIAS A A H1 H1 B ...
Page 84: ...84 ITALIANO INFORMAZIONI UTILI SUL PROCESSO DI MONTAGGIO ...
Page 88: ...88 ITALIANO INSTALLAZIONE DELLA BASE STRUMENTI NECESSARI A A H1 H1 B ...
Page 103: ...103 PL INFORMACJE DOTYCZĄCE ZGŁOSZENIA PRAC MONTAŻOWYCH ...
Page 107: ...107 PL UŁOŻENIE PODSTAWY WYMAGANE NARZĘDZIA A A H1 H1 B ...
Page 118: ......