RECOMMENDED SYSTEM DESIGN 

A healthy, long-term, and trouble free compressed air supply design should be approached as a complete 
system, not individual components. The air compressor Intake location is vital to system health; it should 
supply clean fresh air that  is free from possible contaminant (e.g. ammonia, chlorine or methane).  Any 
contaminant entering the compressor intake will be concentrated by a factor of 8 due to the compression 
process in a typical compressed air system. 

 

A properly sized and maintained compressed air aftercooler is vital to maintaining an acceptable system 
temperature  range.  GSRN  Series  refrigerated  air  dryers  are  designed  to  operate  at  rated  flow  with  a 
maximum  inlet  temperature  of  100°F  (37.7°C).  Units  can  be  oversized  to  accommodate  higher  inlet 
temperatures up to 120°F (48.8°C). As dryer inlet temperatures rise above the design 100°F (37.7°C), the 
moisture  holding  capacity  of  the  air  rises  dramatically.  The  following  table  represents  the  additional 
moisture load at elevated temperatures. 

 

Inlet Temperatures 

100°F (37.7°C) 

105°F (40.5°C) 

110°F (43.3°C) 

115°F (46.1°C) 

120°F (48.8°C) 

Additional Load 

0% 

15% 

32% 

51% 

75% 

 

 

 

The pipe connection to the dryer should match the standard connection ports provided.  The chart below 
is provided as a basic guide to size branch and header piping.  It is recommended that shut-off valves with 
unions be  installed  at each port,  with a  valve bypass to permit isolation of the unit for servicing  without 
interruption of plant air supply. 

 

ELECTRICAL CONNECTION 

 

The Nameplate/Data plate located on each unit identifies the power supply requirements and 
maximum fuse specification.  Units supplied with cord and plug requires the installation of a 
receptacle rated for 15 amps. Units supplied with electrical junctions, require a suitable fused 
disconnect in compliance with the National and Local Electrical Code requirements.  

 
Three phase versions of the GSRN air dryer are NOT sensitive to phase alignment. Rotation of motors is 
universal  
 
The  wiring  of  all  functional  electrical  components  has  been  completed  and  tested  at  the  factory  in 
accordance with the electrical wiring schematic provided with this manual. 
 
 

 

Maximum Recommended Compressed Air Flow  Schedule 40 pipe @ 95 to 115 PSIG 

Pipe Size 

½” 

¾” 

1” 

1¼” 

1½” 

2” 

2½ 

3” 

4” 

6” 

Flow (SCFM) 

40 

100 

150 

200 

350 

650 

900 

1500 

2500 

5000 

Summary of Contents for GSRN Series

Page 1: ...NG STANDARD Contents Introduction Page 2 General Safety Warnings Page 2 Proper Use of the Dryer Page 3 Receiving Equipment Page 3 Installation Location and Piping Page 3 Recommended System Design Page...

Page 2: ...00 682 9868 Failure to install the compressed air dryer per this manual or any change to the dryer not previously authorized by the manufacture will void the warranty The information and specification...

Page 3: ...be located on a level floor or shelf free from vibrations and sufficient to support the total weight of the machinery Although the dryer package is a freestanding unit it may be secured by bolting th...

Page 4: ...100 F 37 7 C 105 F 40 5 C 110 F 43 3 C 115 F 46 1 C 120 F 48 8 C Additional Load 0 15 32 51 75 The pipe connection to the dryer should match the standard connection ports provided The chart below is p...

Page 5: ...ssembly GSRN 50 through GSRN 2250 When maintaining float drains depressurize the dryer drain prior to work initiation Drain line and Drain Connector must be removed prior to bowl and float drain remov...

Page 6: ...0 PSIG for two fan units If the suction analyzer or discharge gauge is not in the specified range contact your local distributor GSRN 100W through GSRN 200W The water cooled series GSRN 100W through G...

Page 7: ...y discharging condensate and air from the drain tube try replacing the solenoid valve diaphragm or the complete drain valve As Required MODEL CAPACITY CORRECTION MULTIPLIER Inlet Temp 90 F 100 F 110 F...

Page 8: ...rize dryer and replace or clean drain strainer 2 Solenoid valve or electronic timer failure Replace drain solenoid and or timer assembly C Drain System Failure with continuous condensate or air discha...

Page 9: ...1200 1500 1750 2000 2250 Min Max Inlet Pressure 30 PSIG 2 1 kgf cm 220 PSIG 30 PSIG 2 1 kgf cm 150 PSIG 10 6 kgf cm Max Inlet Temperature 120 F 48 8 C Min Max Ambient Temperature 50 F 10 C 110 F 43 3...

Page 10: ...to investigate and inspect any assumed defects At seller s option buyer must return any defective materials to seller s plant or authorized depot at buyer s expense Freight charges for returned or rep...

Reviews: