4
Foot Installation
CAUTION ! To maintain the alignment between the
fiberglass covers and the frame, it is very important
that the feet be installed before removing the four
center screws that attach the tensioner assembly to
the upper post flange.
To install the feet, tilt the tensioner back on its side and
screw the four feet into the holes at the corners of the
base.
Stand Upper Post Installation
After installing the four corner feet, remove the four (4)
button head cap screws from the base of the assembly.
Assembly Instructions
Unpacking the Tensioner Assembly
The tensioner assembly is packed inside the inner
carton and is bolted to a sheet of wood with four (4) bolts
to prevent damage during shipment. Another sheet of
wood is bolted to the underside of the inner carton
through the first piece of wood. First locate the nuts
attached to the bolts that secure the outer piece of wood
to the inner piece of wood. Remove the nuts and with
assistance carefully lift the tensioner assembly from the
inner carton and lay it floor. To remove the inner piece of
wood from the base of the machine, raise each end and
remove the four (4) shipping bolts from the underside of
the wooden sheet.
Note: Please retain the bolts, wood
and cartons for future shipment.