Assembly Instructions
Stand Upper Post Installation (cont.)
With the height adjustment cap screw on the upper post
facing the right side of the tensioner, align the four (4)
holes in the upper post flange with the holes in the
tensioner base. Secure the flange to the base with the
four cap screws.
Height Adjustment
The height of the machine is adjustable from 39” to 46”.
To change the height, remove the socket head cap
screw from its current position and place it in the
appropriate hole to set the desired height of the ma-
chine.
5