background image

Scope of Work/Materials 

 
13850 (28 31 00) - 20 
 
Bid No.041818-Installation of New Fire Alarm System at Adams Elementary School 

7. 

Strobe Candela Rating:  Determine by positioning selector switch on back of device. 

 

PART 3 

EXECUTION 

 

3.1 

EXAMINATION 

 

A. 

Examine areas and surfaces to receive fire alarm system. 
1. 

Notify Architect of conditions that would adversely affect installation or subsequent use. 

2. 

Do not begin installation until unacceptable conditions are corrected. 

 

3.2 

INSTALLATION 

 

A. 

Install fire alarm system in accordance with NFPA 72, NFPA 70, state and local codes, 

manufacturer

’s instructions, and as indicated on the Drawings.  Device boxes shall be stubbed 

into an accessible ceiling and supported on j-

hooks at 4’-0” maximum on center.  Electrical 

conduit shall be ¾” minimum. 

 

B. 

Conceal conduit, junction boxes, and conduit supports and hangers in finished areas.  Conceal 

or expose conduit, junction boxes, and conduit supports and hangers in unfinished areas. 

 

C. 

Do not install smoke detectors before system programming and test period.  If construction is 

ongoing during this period, take measures to protect smoke detectors from contamination and 
physical damage. 

 

D. 

Flush-mount fire detection and alarm system devices, control panels, and remote annunciators 

in finished areas.  Flush-mount or surface-mount fire detection and alarm system devices, 
control panels, and remote annunciators in unfinished areas. 

 

D. 

Ensure manual stations are suitable for surface mounting or semi-flush mounting as indicated 

on the Drawings.  Install not less than 42 inches, nor more than 48 inches, above finished floor 
measured to operating handle. 
 

 

3.3 

FIELD QUALITY CONTROL 

 

A. 

Manufacturer’s Field Services:  Provide service of competent, factory-trained technician 

authorized by manufacturer to technically supervise and participate during pre-testing and 
acceptance testing of system. 

 

B. 

Testing: 
1. 

Conduct complete visual inspection of control panel connections and test wiring for short 
circuits, ground faults, continuity, and insulation before energizing cables and wires. 

2. 

Open initiating device circuits and verify that trouble signal actuates. 

3. 

Open signaling line circuits and verify that trouble signal actuates. 

4. 

Open and short notification appliance circuits and verify that trouble signal actuates. 

5. 

Ground initiating device circuits and verify response of trouble signals. 

6. 

Ground signaling line circuits and verify response of trouble signals. 

7. 

Ground notification appliance circuits and verify response of trouble signals. 

8. 

Check installation, supervision, and operation of intelligent smoke detectors. 

Summary of Contents for E3 Series

Page 1: ...Data Interchange 2 RS 485 standard defining the electrical characteristics of drivers and receivers for use in balanced digital multipoint systems B National Fire Protection Association NFPA 1 NFPA 12...

Page 2: ...ary power failure until alarm signal is processed and recorded 7 Network Node Communications a Communicated between panels on single pair of copper wires or fiber optic cables b To enhance system surv...

Page 3: ...ean control by event programming including as a minimum AND OR NOT and Timer functions 6 Control Panels Capability to accept firmware upgrades via connection with laptop computer without requirement o...

Page 4: ...uding elevator recall elevator power shutdown door lock release door holder release HVAC unit shutdown smoke evacuation system activation and stair pressurization fan activation 5 Bill of Material OWN...

Page 5: ...bmittals and shop drawings letter of certification from Gamewell FCI indicating proposed engineered system distributor is an authorized representative in good standing of the equipment supplied Includ...

Page 6: ...of devices circuits zones and changes to system operation and custom label changes for devices or zones 4 System structure and software shall place no limit on type or extent of software modification...

Page 7: ...ly Module PM 9 with batteries 3 80 Character LCD Display LCD E3 4 Intelligent Loop Main Board Interface ILI MB E3 or ILI95 MB E3 5 Optional Intelligent Loop Supplemental Interface ILI S E3 or ILI95 S...

Page 8: ...or and control modules Display shall be liquid crystal type LCD clearly visible in dark and under all light conditions 3 Panel shall contain 4 functional keys a Alarm Acknowledge b Trouble Acknowledge...

Page 9: ...cuits on SLC or NAC circuits disarrangement in system wiring failure of microprocessor or any identification module or system ground faults shall activate this trouble circuit Trouble signal shall be...

Page 10: ...ull 4100 event history log supporting local and network functions If a main processor or network node is lost the entire log shall be accessible at any other Loop Interface board This shall be demonst...

Page 11: ...e alarm systems in accordance with NFPA 72 as it is impossible to test all functions and verify items such as annunciation with only 1 person 24 Signaling Line Circuits Each ILI MB E3 module shall pro...

Page 12: ...from 64 nodes to 122 nodes ANX SR Addressable Node Expander Single Ring will function in single 64 node systems 3 ANX shall provide a Ethernet Port for use in Systems Integration and for use with Eme...

Page 13: ...e Detectors Provide 2 status LEDs Both LEDs shall flash under normal conditions indicating detector is operational and in regular communication with control panel and both LEDs shall be placed into st...

Page 14: ...trol panel send data to panel representing analog level of products of combustion F Intelligent Multi Criteria Acclimating Detectors MCS ACCLIMATE2F 1 Addressable device designed to monitor a minimum...

Page 15: ...1 The detector shall be comprised of four sensing elements including a photoelectric light scattering particulate sensor an electrochemical CO sensor a daylight filtered infrared IR sensor and solid...

Page 16: ...hange over air handling systems to help prevent rapid distribution of toxic smoke and fire gases throughout areas served by duct system 3 Duct Smoke Detectors Mounted Above Ceiling or Otherwise Obstru...

Page 17: ...D to blink latch on or latch off Flash under normal conditions indicating monitor module is operational and in regular communication with control panel P Addressable Dry Contact Monitor Modules MMI 10...

Page 18: ...module NAC Wire for Style Z or Style Y Class A B with up to 1 amp of inductive signal or 2 amps of resistive signal operation Relay coil shall be magnetically latched to reduce wiring connection requi...

Page 19: ...nel D NGA Network Graphic Annunciator 1 Main Menu a Configure allows Auto configuration of ILI MB S and NGA or ANX b Walk Drill enables Walk Test and Fire Drill function c I O Allows enable disable in...

Page 20: ...arm system devices control panels and remote annunciators in finished areas Flush mount or surface mount fire detection and alarm system devices control panels and remote annunciators in unfinished ar...

Page 21: ...anufacturer representative of Owner and fire department shall operate every installed device to verify proper operation and correct annunciation at control panel 3 Open signaling line circuits and not...

Reviews: