background image

 

© Galvin Engineering Pty Ltd 

Version 1, 1 June 2022, Page 

3

 of 

6

 

Product Installation Guidelines 

Version 1, 25

th

 May 2022, Page 

3

 of 6 

INSTALLATION

 

INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these 
installation  instructions  and  in  accordance  with  AS/NZS  3500,  the  PCA  and  your  local  regulatory 
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or 
state standards. Failing to comply with these provisions shall void the product warranty and may affect the 
performance of the product.  

 

 

   

 

1.  Top Flange  

Mark the height of the top flange centre point by 
measuring vertically 2275mm above the floor. Then 
measure approximately 150mm horizontally to the 
left or right (depending on the position of the 
shower recess) of the centre of the existing supply 
fitting. Drill 2 holes Ø8 x 50mm deep, 38mm 
horizontally apart to suit the top flange. 

2.  Bottom Flange  

Mark the position of the bottom flange’s centre point 
400mm below the top flange’s centre

 

point. Then mark 

the two holes for mounting the bottom flange in a 
similar manner to the top flange. 
 

Note:

 The bottom flange is mounted in a vertical 

orientation. 
 

Important:

 

the functionality of this product relies on the 

accuracy of the vertical alignment between the top and 
bottom flanges.

 

 

 

3.  Mount the shower arm 

Attach both the wall flanges using the plastic star 
plugs and self-tapping screws supplied (these 
fasteners may not be appropriate for all wall 
materials. If this is the case, other fastening 
systems will have to be sourced by the installer).

 

4.  Attach the hose  

When fitting the inlet hose, lay the arm against the wall 
in  the  preferred  ‘resting’  position,  then  tighten  the 
hose. The arm will tend to return to this position when 
not in use. 

38

DRILL 2 HOLES

Ø8x50 DEEP

2275mm ABOVE
THE FLOOR

Reviews: