3
CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
2 OPERA
2 OPERA
2 OPERA
2 OPERA
2 OPERATOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
TION
TION
TION
TION
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
7 F
7 F
7 F
7 F
7 FAUL
AUL
AUL
AUL
AULT FINDING
T FINDING
T FINDING
T FINDING
T FINDING
CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Impor
Impor
Impor
Impor
Important Information
tant Information
tant Information
tant Information
tant Information -----------------------------------------
-----------------------------------------
-----------------------------------------
-----------------------------------------
----------------------------------------- 4
Section 1 Intr
Section 1 Intr
Section 1 Intr
Section 1 Intr
Section 1 Introduction
oduction
oduction
oduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Controls
ols
ols
ols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 T
Section 3 T
Section 3 T
Section 3 T
Section 3 Technical Information
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & Safety
Health & Safety
Health & Safety
Health & Safety
Health & Safety ------------------------------
------------------------------
------------------------------
------------------------------
------------------------------ Inside Front Cover
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
4 INST
4 INST
4 INST
4 INST
4 INSTALLA
ALLA
ALLA
ALLA
ALLATION
TION
TION
TION
TION
IMPORTANT
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
HEAL
HEAL
HEAL
HEAL
HEALTH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
43
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION 4
TION 4
TION 4
TION 4
TION 4
4-6
System Pressure
Fig. 4-6a Pressure Diagram
Notes on Pressures:-
1. The Mains Pressure Reducing Valve is not normally required on standard systems
with normal mains pressure, however, if the mains pressure is more or fluctuates
above 4 Bar a Mains Pressure Reducing Valve should be considered.
2. The Combination Valve has an integral pressure reducing valve fixed at 3.5 Bar
therefore the hot water System Pressure will be 3.5 Bar maximum.
3. If the Mains Pressure is less than 3.5 Bar then the hot water System Pressure will be
at maximum Mains Pressure.
4. The Combination Valve has a Pressure Relief Valve (PRV) set at 6 Bar.
5. The unvented cylinder has a Temperature and Pressure Relief Valve (TPRV) set at 7
Bar.
6. The heating system has a TPRV set at 3 Bar.
ELECTRASTREAM PLUS ONLY
7. The Accumulator Pressure is factory set at 2 Bar.
8. The recommended Accumulator Pressure is 1.5 Bar below the mains pressure with
an absolute minimum of 0.8 Bar - see 5-1, Stage 9. Consult GAH (HEATING
PRODUCTS) for further information.
44444
Summary of Contents for Electrastream
Page 55: ...55 ...