2
Important Health and Safety Information for Installers and Service Engineers
Health and Safety at Work Act 1974
Consumer Protection Act 1987
COSHH Regulations 1988
The following information is given as a requirement of the
above legislation.
Great care is taken by GAH (HEATING PRODUCTS) LIMITED
to ensure that Electrastream systems are designed and
manufactured to meet general safety requirements when
properly used and installed as recommended in this manual.
It is the responsibility of Users and Engineers to ensure that
adequate protective clothing and glasses are worn when
working with the Electrastream system.
SEALS AND INSULATION
SEALS AND INSULATION
SEALS AND INSULATION
SEALS AND INSULATION
SEALS AND INSULATION
Insulation and sealing materials are used in the construction
of the Electrastream cylinders. Units are sealed and when
used in the manner for which they are intended the insulating
and sealing materials do not present any known hazard.
However always observe the following recommendations:-
1. Avoid inhalation of fibres or dust, wear face mask.
2. Avoid eye contamination by fibres or dust - wear eye
protection.
3. As far as possible avoid any skin contact with Fibreglass
Insulation, Glass Rope, Mineral Wool, Insulation Pads and
Ceramic Fibre.
PPPPPatent application 01514800.2
atent application 01514800.2
atent application 01514800.2
atent application 01514800.2
atent application 01514800.2
©
©
©
©
©
2010 GAH (HEATING PRODUCTS) L
2010 GAH (HEATING PRODUCTS) L
2010 GAH (HEATING PRODUCTS) L
2010 GAH (HEATING PRODUCTS) L
2010 GAH (HEATING PRODUCTS) LTD.
TD.
TD.
TD.
TD.
Electrastr
Electrastr
Electrastr
Electrastr
Electrastream is a T
eam is a T
eam is a T
eam is a T
eam is a Trademark of GAH (HEATING PRODUCTS) L
rademark of GAH (HEATING PRODUCTS) L
rademark of GAH (HEATING PRODUCTS) L
rademark of GAH (HEATING PRODUCTS) L
rademark of GAH (HEATING PRODUCTS) LTD.
TD.
TD.
TD.
TD.
Manual by Harber Technical Services Tel/Fax 01263 515444
E-mail:[email protected] www.harbertech.co.uk
GAH (Heating Pr
GAH (Heating Pr
GAH (Heating Pr
GAH (Heating Pr
GAH (Heating Products) Ltd.
oducts) Ltd.
oducts) Ltd.
oducts) Ltd.
oducts) Ltd.
Building 846
Bentwaters Parks
Rendlesham
Woodbridge
Suffolk IP12 2TW
TTTTTel:
el:
el:
el:
el: 01394 421160
01394 421160
01394 421160
01394 421160
01394 421160
Fax:
Fax:
Fax:
Fax:
Fax: 01394 421170
01394 421170
01394 421170
01394 421170
01394 421170
email: [email protected]
www.gah.co.uk
In pursuance of a policy of constant development, GAH (HEATING PRODUCTS) LIMITED
reserve the right to change Electrastream parts or design without notice, therefore
certain details included in this manual may not be correct at the time of printing. Any
modification and improvements detailed in this manual does not commit GAH to update
any system previously supplied.
Manual Part No. ...................MAN1019
Manual Ref ..........................ES02
Issue ...................................13
Date ....................................25/02/13
GAH (HEATING PRODUCTS) LIMITED will not accept
responsibility for any damage or personal injury caused
by not giving due consideration to the above safety
recommendations.
OTHER MATERIALS
OTHER MATERIALS
OTHER MATERIALS
OTHER MATERIALS
OTHER MATERIALS
SEALANTS, ADHESIVES AND PAINTS
Sealants, Adhesives and Paints are used in the construction of
the Electrastream components. When used in the manner for
which they are intended they do not present any known hazard.
ELECTRIC
ELECTRIC
ELECTRIC
ELECTRIC
ELECTRIC
The Cylinder Tri-Core Heater, Pump, Thermostats and Contactor
Box all have electrical supply of 230V (enough to endanger
life).
Always isolate before connection, adjustment, servicing and
repair.
When the Tri-Core Heater cover is removed high power live
electrical terminals are exposed.
ISOLATE THE TRI-CORE HEATER BEFORE REMOVING ITS
COVER.
Earth protection - Earth Continuity Conductors must be fitted
and must comply with IEE Wiring Regulations.
HTS REF GAH ELECTRASTREAM 25/02/13
HEAL
HEAL
HEAL
HEAL
HEALTH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
38
Fig. 4-4e Heating Expansion Vessel, TPR Valve and Filling Loop
HEATING EXPANSION VESSEL
FIXING BRACKET
HEATING FLOW
TPR VALVE DISCHARGE TO TUNDISH
(NO VALVES)
DOUBLE CHECK VALVE
ISOLATING VALVE
MUST BE DISCONNECTED
WHEN NOT IN USE
MAINS SUPPLY
Note
One Tundish is supplied with the
Electrastream, this should be fitted to the
hot water TPRV and heating PRV
discharge, see fig. 4-4a.
Fig. 4-4d Static Head
Note
Normally expansion requirement is 4% of
the system water content including the
unvented cylinder coil.
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION 4
TION 4
TION 4
TION 4
TION 4
IMPORTANT Under no circumstances should the system be operated
without the heating PRV fitted and working correctly.
4-4.5 Heating PRV Discharge Pipe
The outlet from the heating PRV must be piped using 15mm copper pipe to the tundish
then to a visible position outside the dwelling. The pipe must have a continuous fall and
ideally be terminated over a drain.
The heating PRV may be plumbed to the hot water system TPRV discharge prior to the
Tundish, see fig. 4-4a.
The PRV discharge must comply with Building Regulations G3 refer to pages 40-42.
IMPORTANT Scalding water and steam can be emitted from the
discharge pipe. Position the discharge so there is no hazard to property
or people (especially children).
4-4.6 Heating System Expansion Vessel (red)
Maximum charge pressure
1.5 Bar Maximum working temperature
90°C
Pre-charge pressure
1 Bar Maximum working pressure
3 Bar
Capacity
8 litres for maximum system expansion of 7 litres.
An expansion vessel and mounting kit is supplied, this is suitable for systems with a
static head of up to 5 metres. If the static head is greater than 5 metres the charge
pressure of the expansion vessel will need to be increased. Increase the pressure using a
standard car tyre pump and pressure gauge when the system is empty (zero pressure).
Expansion vessels are suitable for systems requiring a maximum expansion of 7 litres as
detailed above. For systems requiring more expansion a second expansion vessel will be
required. BS7074 Part 1 includes information on this requirement.
Clearance is required on top of the vessel to access the pressure valve.
4-4.7 Filling Loop
A Filling Loop comprising a flexible hose, double check valve and an isolating valve is
supplied for filling and topping up the system.
PRESSURE GAUGE
44444
Summary of Contents for Electrastream
Page 55: ...55 ...