GABRIEL KERAMIK AB
11
550 mm
4
3
550 mm
6a
13
14
15
Set outer ring (4).
Assembly
Set outer ring (3) with mortar.
Level vertically and horizontally.
Check that the height is
within tolerance (550 mm)
Set the fifth firebox block (6a)
on top of the fourth one. Make sure
that no mortar falls between the
blocks. Seal with insulation at the
front edge of the U-formed blocks.
Level vertically and horizontally.
Note! Remove any excess
mortar that has fallen to the
bottom in the left and right
smoke gas channel. Clean
the channels with a wet
brush.
Make sure that no mortar falls
into the expansion gap at the
back of the firebox blocks.