GABRIEL KERAMIK AB
12
7
min.
500
1020 mm
5
9
16
17
18
Assembly
Cut the insulation.
Set the top of the firebox block (7)
in mortar.
Before continuing above the
firebox opening, construct
a prop to support both the
outer ring and the firebox
top block as shown in the
picture. This will enable you
to continue without disturb-
ing the vertical measure-
ments as you progress.
The support will also be of
help when tiling above the
firebox.
Set the outer shelf block (5) with
mortar.
Cut a piece of insulation to seal the
space
under
the shelf.
Check that the height is
within the tolerance
(1020 mm).
Set the outer ring (9) with mortar.
Level vertically and horizontally.